Orange County NC Website
0.20 <br /> h. Wherever possible, provide handicapped parking spaces and ramps. <br /> Construct all walking and bicycle paths on slopes no greater than 5%. <br /> 32. All plans for drainage, soil erosion and sedimentation control shall be <br /> reviewed and approved by Orange County and the site plan modified accordingly <br /> to satisfy the Soil and Erosion specifications. In addition, Orange County <br /> shall inspect the installation of control devices and the on-going work for <br /> the total project. The project shall at all times meet the requirements of <br /> the Orange County Soil Erosion and Sedimentation Control Ordinance. <br /> 31 . Grading on the site shall be kept to a minimum. In lieu of planted <br /> landscaping, existing vegetation shall be maintained between units. <br /> 32. That all signs be erected in compliance with Article 9 Signs following <br /> issuance of a building permit and prior to the issuance of a Certificate of <br /> Occupancy for any unit. No sign may be erected within the sight triangles for <br /> the entrancewayslto the development. <br /> 33. Final landscaping plans shall be submitted and approved prior to the <br /> initation of construction activity. <br /> 34. That all structures be erected in compliance with applicable building <br /> codes following submittal for and issuance of building permits. <br /> 35. A final boundary survey of the Planned Development and improvements shall <br /> be recorded by the developer. <br /> 36. The final site plan and narrative of the project incorporating all <br /> changes, deletion',s and additions through the final approval of the project are <br /> incorporated herein and made a part of this Planned Development Special Use <br /> Permit. A copy, of the final site plan and narrative are on file with the <br /> Orange County Planning Department. Grading and building permits, upon <br /> application, will be issued after approval and recordation of the Special Use <br /> Permit. <br /> 37. The development shall be built and operated according to the site plan <br /> and written narrative supplied by the developer and in compliance with or <br />