Browse
Search
Agenda - 06-04-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 06-04-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 2:29:23 PM
Creation date
9/19/2016 2:12:31 PM
Metadata
Fields
Template:
BOCC
Date
6/4/1981
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the years 1955 and 1977- (Table 3-133) . <br /> TABLE 3-133 <br /> HILLSBOROUGH TOWNSHIP FARMLAND TRENDS 1 <br /> CHANGE <br /> 1955 1977 1955-77 CHANGE <br /> TOTAL CROPLAND 1,842 ac. 991 ac. -851 ac. -42.6% <br /> TOTAL PASTURE 1,780 ac. 1,623 ac. -157 ac. -8.8% <br /> TOTAL FARMLAND 3,622 ac. 2,614 ac. -1,008 ac. -27.8% <br /> 1SOURCE: N.C. Crop and Livestock Reporting Service; Triangle J Council <br /> of Governnents. <br /> As shown, the cropland base of the Township declined in this period by <br /> almost 1000 acres. In contrast, during the same period the pastureland <br /> base decreased at a much slower rate of about 9%, representing a loss of <br /> fewer than 160 acres. <br /> Part of this loss probably occurred as a consequence of the construction <br /> of Interstate 85 through Hillsborough Township. The three townships <br /> though which the Interstate was built lost an average of more than 26% <br /> of their total crop and pasture land as compared to an average loss of <br /> 19% for the remaining four townships. Such major highway construction <br /> can cause farmland loss through both direct acquisition and through the <br /> commercial, industrial and residential development stimulated by improved <br /> transportation access. <br /> Much of Hillsborough Township's farmland is concentrated in the portion <br /> of the Township north of the intersection of N.C. 86 and N.C. 57. As such, <br /> construction of the Interstate 40 along the proposed corridor will have <br /> very limited direct impact on the Township's agricultural land. The <br /> indirect effect, however, will be to increase development pressure on farm- <br /> land, even in the area to the north of the Town of Hillsborough. The <br /> greatly reduced travel time that proposed Interstate 40 extension will <br /> provide from Hillsborough to Research Triangle Park, RDU airport and Raleigh <br /> will probably increase the convenience of Hillsborough Township as a place <br /> of residence and as a location for new businesses. Conversion of more <br /> Township farmland to non-farm uses will probably result from this increAs- <br /> ed access. <br /> Natural Environmental Constraints <br /> Hillsborough Township contains the following natural environmental constraints <br /> to development activity: floodplains, a water supply watershed, steep slopes <br /> and some poor soil conditions. <br /> FLOODPLAINS. Floodplains occur along the Eno River, Cates Creek and Strouds <br /> Creek. <br />
The URL can be used to link to this page
Your browser does not support the video tag.