Browse
Search
Agenda - 05-04-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 05-04-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 12:09:40 PM
Creation date
9/19/2016 12:03:49 PM
Metadata
Fields
Template:
BOCC
Date
5/4/1981
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
76, <br /> HJ,J ( <br /> . . <br /> Memo Sam Gattis <br /> March 30, 1981 <br /> . . Page 3 <br /> . . <br /> - Septic tanks and drain lines cost, between $1200 and $1500 to install. <br /> - Wells cost $8.00/Tootto drill, <br /> - The private road might have to be upgraded to the next highest class <br /> *pending on the number of lots on the road. <br /> - Attorneys fee's might range from $200-$400 depending on the problPm <br /> 1/11701Ved.. . ..' <br /> . . . <br /> . ' - • . . ' '' , <br /> - - - - ':-::;•.1: <br /> 3. • New7lot:on. a peivate road - ' P .1 ' 7- , • <br /> . .. . . . . . <br /> . : . <br /> . . , . <br /> Survey $320.00 <br /> -Ci . . •, . ....., . <br /> 0C SOil evaluation 20.00 <br /> :-.,. <br /> 1 Acre . ./;!*. Tax map , <br /> ., , <br /> 1.00 <br /> ,'4,-• <br /> r.. <br /> C -.....---..-- --- :.;;': • _ . <br /> . . <br /> . '.3 <br /> aY - Well permit 50.00 <br /> , <br /> , . . . ..._-- Improvements permit 15,00 <br /> .----- <br /> . <br /> li septic"tank permit 15.00 <br /> : S.R <br /> . . <br /> 471.00 <br /> -.. <br /> - Spetic tanks cost $12,00 to $1500 to install- <br /> Wells . , . <br /> . - 7 cbst $8.00/foot tO drill. .'. <br /> Class "C'' road construction 7.50/foot <br /> i Class "B" road construction 12.00/foot <br /> Class "A" road construction 14,00/foot <br /> e <br /> il (These costs vary'according to terrain, clearing required <br /> 4 . or pipes necessary) . , <br /> If it is a Class "C" road it would cost $2250. to construct, <br /> The road maintenance agreement costs $150_00. <br /> '-.. <br /> Road sign costs $40.00 <br /> -4. <br /> Survey $700.00 <br /> . . <br /> Soil evaluation 80.0Q <br /> 1 AC 1 AC 1 AC 1 AC Tax map 1.00 <br /> S. R. . ____ 791.00 <br /> _______- Well permits 200,00 <br /> Improvements permits 60.00 <br /> • <br /> Final septic tank inspection 60.00 <br /> $1101.00 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.