Browse
Search
Agenda - 04-13-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 04-13-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 11:36:05 AM
Creation date
9/19/2016 11:33:09 AM
Metadata
Fields
Template:
BOCC
Date
4/13/1981
Meeting Type
Special Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
weramagamom mem I a agnagsasi <br /> ORANGE COUNTY CAPITAL IMPROVEMENTS PLAN <br /> Departwent Capital Request Worksheet Oat! <br /> Orange Industries <br /> 1:4oject Description Construction of a 10,000 sq. ft. facility to house Orange <br /> .1 TheTresent workshop for handicapped and retarded residents of Orange County is <br /> multi-floored complex of buildings not designed for this use. Cooling and 'vehti <br /> inadequate. Moreover, the workshop is now able to serve less than half of the i <br /> handicapped population because of spatial limitations and architectural barriers <br /> 2. Project Objectives Provide a safe and suitable facility for the 40 individuals <br /> by Orange Industries. Increase enrollment by offering service to eligibles now <br /> list, to Orange County residents attending workshops outside the County, and to <br /> alized residents ready for community placement. <br /> Costing Method Basedon 10,000 sq. ft. @ 520.00/sq. ft. for a Butler-type build <br /> Two to four acres Of urban land estimated at $50,000. <br /> ...,..0■04M.MFA,a <br /> • <br /> 4. Justification for Annual Funding Schedule Schedule based on desire to complete <br /> by late 1981. It is felt that this facility is urgently needed for safety of pet <br /> property. <br /> 51Velationships to Other Projects or Departments None <br /> 6. Operating Budget Impact Explain: No operating cost increase 7. Type <br /> to Orange County is anti- <br /> Personnel $____ <br /> cipated. X R <br /> Maintenance <br /> Utilities $ E <br /> Nt <br /> Other <br /> RI <br /> 8. Other Agency Interaction (Regulatory, Approvals, Funding Sources, Etc.) <br /> New facility will be in compliance with Section 504 of the Rehabilitation Act of 1 <br /> requiring barrier-free structures for service to the significantly handicapped. <br /> 9. Project Priority <br /> Submitted by: Orange County Committee f <br /> Nn ^4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.