Orange County NC Website
[t.7 <br /> t.) <br /> PHILIP POST <br /> ET ASSOCIATES <br /> ENGINEERS/PLANNERS/StllivEYORS <br /> Orange County Board of Commissioners <br /> 23 February 1981 <br /> Page 2 <br /> ■ <br /> which would restrict all development in the floodplain. <br /> -Require the design of slope stabilization for fill areas <br /> to be certified by an Engineer or Architect. <br /> -Require that the applicant for any construction in the <br /> floodway submit proof from an Engineer that the construc- <br /> tion will not increase total stream flow, or the velo- <br /> city of stream flow, to downstream property owners. <br /> I will appreciate the opportunity of presenting these suggestions to <br /> you I look forward to the implementation of a sound, workable ordinance <br /> for Flood Damage Prevention in Orange County, arid especially an ordinance <br /> which will be fair to all residents. <br /> Sincerely, <br /> 'hilip . Post, P.E., RLS <br /> PMP/pds <br /> ? <br />