Browse
Search
Agenda - 02-17-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 02-17-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 10:09:31 AM
Creation date
9/19/2016 10:08:36 AM
Metadata
Fields
Template:
BOCC
Date
2/17/1981
Meeting Type
Work Session
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ - <br /> z <br /> "I) <br /> Memorandum - Sam Gattis <br /> 9-29-80 <br /> Page 2 <br /> 3. PLAN REVIEW: 40,000 sq.ft. - 80,000 sq. ft. disturbed <br /> Conference with landowner 1 hour <br /> Initial site inspection 1 hour <br /> Review of plan -4 hours <br /> Letter to owner enumerating plan modifications *2 hours <br /> TOTAL HOURS 8 hours (1 working day) <br /> A <br /> $80.00 flat fee per review is recommended (based on $10.00/hr.) <br /> 4. PLAN REVIEW: over 80,000 sq. ft. disburbed <br /> More complicated plan review 8 hours <br /> May require several site visits 2 hours <br /> More time on modifications/ammendment letter 4 hours <br /> TOTAL HOURS 16 hours (2 working days) <br /> $160.00 flat fee per review is recommended <br /> ,5. GRADING PERMITS: 40,000 sq. ft. - 80,000 sq. ft. disturbed <br /> A grading permit is issued when Sedimentation and Erosion Control Plan is <br /> approved. <br /> Involves periodic site inspections (4 per month). Involves use of County vehicle. <br /> RECOMMENDATION:, $10-007 10,000 square feet disturbed. <br /> 6. GRADING PERMITS: Over 80,000 sq. ft. disturbed <br /> A grading permit is issued when Sedimentation and Erosion Control Plan is <br /> approved. <br /> Involves more site inspections ( 6 per month). Involves use of County vehicle. <br /> 4 <br /> More inspection time per inspection. <br /> Longer construction time. <br /> RECOMMENDATION: $12-00/ 10.000 square feet disturbed. <br /> 7. RENEWALS: A permit time limit of one year from the date of issuance is <br /> recommended. In order to reduce the negative impact on projects lasting, <br /> for example, 15 months, it is suggested that renewal of a permit be valid <br /> for six months at one-half the original application fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.