Browse
Search
Agenda - 01-29-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 01-29-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 9:44:17 AM
Creation date
9/19/2016 9:41:28 AM
Metadata
Fields
Template:
BOCC
Date
1/29/1981
Meeting Type
Schools
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . <br /> -2- <br /> Other Needs <br /> 1. Multipurpose Building - Estes Hills $ 300.000 <br /> 2. Multipurpose Building - Glenwood 300,000 <br /> (based on 1979 costs for duplicating <br /> the F.P.G. multipurpose building) <br /> 3. CHHS site development - includes soccer <br /> field (joint use with Seawell), paving <br /> rear parking lots, numerous sidewalks <br /> and landscaping. Fereebee-Walters <br /> provided a brief study on some of this <br /> in 1974 (79 cost) Total 695,000 <br /> 4. CHHS athletic field lighting renovation - <br /> from study by Knott Roberts - 1980, plus <br /> add for changing to four steel light poles. <br /> We have the light fixtures for this project <br /> in the warehouse 35,000 <br /> 5. Site improvement for all schools. A plug <br /> figure developed in 1979 and used on the <br /> 10-10-79 state survey 86,000 <br /> 6. Bleachers <br /> CHHS b.b. field 150 seats <br /> Phillips b.b. field 75 seats <br /> Phillips football field 300 seats <br /> Culbreth football field 300 seats <br /> rough estimate 1980 211000 <br /> 7. Cafeteria and kitchen renovations <br /> from 10-10-79 state survey 249,000 <br /> 8. Reroofing Glenwood, Lincoln, CHHS "B" <br /> building and Seawell administration <br /> building. This is a 5 to 7 year <br /> projection of needs - used $4.00 <br /> sq. ft. (approximately 116,500 sq. ft.) <br /> includes fees and contingency 465,000 <br /> Total Cost $ 2,151,000 <br /> Grand Total $ 7,613,700 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.