Browse
Search
Agenda - 01-29-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 01-29-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 9:44:17 AM
Creation date
9/19/2016 9:41:28 AM
Metadata
Fields
Template:
BOCC
Date
1/29/1981
Meeting Type
Schools
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHOOL FACILITY NEEDS <br /> September '80 <br /> Renovations of Buildings <br /> 1. Elementary schools - taken from the <br /> utilization committee study in <br /> June 1980 $ 1 ,309,000 <br /> 2. CHHS science and guidance areas <br /> renovation (1980 cost est. ) 70,000 <br /> 3. Phillips - renovation of heating system <br /> to heating and air conditioning (rough <br /> estimate including some insulation and <br /> based on staff estimate from the <br /> elementary schools renovation project) 1980 cost 876,000 <br /> 4. F.P.G. primary building and administration <br /> building HVAC renovation (rough estimate <br /> based on staff estimate from the elementary <br /> schools renovation project) 1980 cost 240,000 <br /> Total Cost $ 2,494,000 <br /> New Or Renovated Facilities For Exceptional Children <br /> New elementary school , which allows for <br /> redistribution of student population and <br /> space in all schools for exceptional <br /> programs (cost from 1979 state data for <br /> 500 student school) $ 2,031,700 <br /> Total Cost $ 2,031,700 <br /> Accessibilit For The Handica' 'ed <br /> From 1979 estimate provided by Daryl Spencer <br /> (state authority on handicapped renovation of <br /> $50 per student (5300 x 50) $ 265,000 <br /> Renovation For Energy Conservation <br /> (The figure is reduced by three schools - Carrboro, <br /> Estes Hills, and Glenwood for a dollar reduction <br /> of $300,000) $ 672,000 <br /> Total Cost $ 672,000 <br /> • <br /> 10-6-80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.