Browse
Search
Agenda - 12-17-1985 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 12-17-1985 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 8:44:53 AM
Creation date
9/19/2016 8:37:06 AM
Metadata
Fields
Template:
BOCC
Date
12/17/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; <br /> ... ; <br /> • • <br /> . . NORTH CAROLINA STATE DEPARTMENT OF TRANSPORTATION 02E <br /> DIVISION OF HIGHWAYS <br /> •SECONDARY ROAD ADDITION INVESTIGATION REPORT <br /> • <br /> County _orm,ei. Co. File No. Date <br /> Townshipchappi H 11 Div. File No. <br /> . . <br /> Local Namenry Creek Road Subdivision Name N/A <br /> Length 0.25 I Width 20' D. to D. Type B Condition yeir <br /> , <br /> Is this a subdivision street subject to the construction requirements for such - <br /> streets? Yes Recorded°4-21-72 Book 19 Page 191 <br /> Is this a subdivision street subject to participation paving? yes <br /> Number of homes having entrances into road Nine <br /> Other uses having entrances into road None <br /> Does right-of-way obtained meet present Division of Highways requirement? nedicatpd <br /> If not, why? <br /> Is petition (sR-9 attached? Yes <br /> Is the County Commissioners' Approval (SR-2) attached? <br /> If not, why? 1 <br /> Does the road meet present minimUm Division of Highways construction requirements? <br /> No <br /> If not, state what is needed to place the road in an acceptable maintenance <br /> condition under Remarks and Recommendations. <br /> Is a map attachedlindicating information for reference in locating road by the <br /> Planning Department? Yes <br /> Cost to place in acceptable maintenance condition: Total Cost $ 15,000.00 <br /> Grade, drain, stabilize $15,000.00 , Drainage $ 1,000.00 , Other $ 1),00 <br /> 1 <br /> Remarks and ReconnendationsThe road will require grading and stabilization. The <br /> .property owners are paying W,000.00 to bear a portion of the cost for upgrading <br /> the road to Statd standards, therefore, we recommend addition. <br /> I <br /> Reviewed and approved <br /> Board of Transportation Member <br /> 1 , / <br /> 1 1 Reviewed and approved.T. W. Watkins <br /> DIVISION ENGINEER DISTRICT N. Jnneg- • --lc' ,'if' <br /> STRICT ENGIN <br /> " <br /> - I ' <br /> • % <br /> \, ,.. <br /> (Do not write in this space - <br /> • <br /> 1 tat \ 1 <br /> . For use of Secondary Roads Dept.) <br /> \ <br /> - --.. <br /> Petition No. . <br /> .,. <br /> . \ 1 <br /> \ <br /> N. - <br /> (Do not write in this space - <br /> I . <br /> For use of Planning Dept.) <br /> , . I <br /> . ..,' <br /> . . <br /> ..,,,.... . I <br /> \\ I <br /> 4,-7•TiN\ pk. \ . • <br /> . i <br /> . - <br /> • i <br />
The URL can be used to link to this page
Your browser does not support the video tag.