Orange County NC Website
Article 5: Uses <br /> Section 5.14: Standards For Manufacturing,Assembly& Processing <br /> from the property line. <br /> \Winery, Hours of operation shall be limited to the hours between 7 a/Orae <br /> Site shall have direct access to a major road, as classified iy <br /> Comprehensive Plan, and shall us e said road as the prima <br /> approved otherwise in the permit. <br /> 5. ction only <br /> (A) Standar for Class B Special Use Permit or ASE-CZ Zonin istrict <br /> (1) If loc ed in an AR or RB zoning district, the winery st be located on a bona <br /> fide far . <br /> (a) A 'nery, production only, that is locat d on a bona fide farm, and which <br /> utiliz primarily crops produced on ite is considered a bona fide <br /> farming se and is not subject to ning regulations. <br /> (b) A winery, p duction only, th does not utilize primarily crops produced <br /> on-site, regar ess of whet r it is located on a bona fide farm, is not <br /> considered a bo a fide f ing use and is subject to the regulations <br /> contained in this din ce. <br /> (2) If located adjacent to resid t Ily zoned property, all buildings shall be located a <br /> minimum of 100 feet fro the pr erty line. <br /> (3) Application materials all include a omprehensive groundwater study, for <br /> facilities expected use more groun ater on an annual basis than an average <br /> single family res' ence (which uses 240 Ilons of water per day) built at the <br /> highest densi the existing zoning district uld allow. For example, if the <br /> existing zo g district allows a residential de ity of 1 unit for 2 acres and the <br /> propose se is on a six acre parcel (which cou yield 3 residences), the <br /> propos d use(s) may use three times the water us d by an average single family <br /> resi nce (or 720 gallons per day, on an annualized asis) before a <br /> c prehensive groundwater study is required. The wa r usage rates of any <br /> xisting use subject to zoning regulations located on the me lot shall be taken <br /> into account when determining if a comprehensive ground ter study is required. <br /> Said study shall detail: <br /> (a) The amount of water anticipated to be used on a daily, w kly, monthly, <br /> and annual basis by regulated uses located on the parcel (e. ., water <br /> usage by bona fide farm uses is not required to be included); <br /> (b) An analysis of the amount of groundwater withdrawal considered be <br /> safe and sustainable in the immediate vicinity; and <br /> (c) An analysis of whether other wells in the vicinity of the proposed use ar <br /> expected to be affected by withdrawals made by the proposed use. <br /> 5.14.5 Industrial, Light <br /> (A) Standards for the O/RM Zoning District <br /> (1) The following Multiple Uses are permitted in the O/RM zoning district when the <br /> Principal Use type is Industrial, Light and adhere to the standards of Section <br /> 5.14.5(A)(2): <br /> (a) Banks & Financial Institutions <br /> (b) Beauty & Barber Shops <br /> (c) Laundry& Dry Cleaning Services <br /> (d) Nightclubs, Bars, Pubs <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-132 <br />