Browse
Search
Agenda - 03-13-2007-9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-13-2007
>
Agenda - 03-13-2007-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:38:48 PM
Creation date
8/28/2008 11:25:08 AM
Metadata
Fields
Template:
BOCC
Date
3/13/2007
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20070313
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
overall CM at Risk contract. If approved at that time, construction is scheduled to commence on <br />June 14, 2007. <br />Completion of all phases of construction of the Project is anticipated for the summer of 2008. <br />FINANCIAL IMPACT: The kitchen design based upon the Kitchen Subcommittee input has <br />increased the scope of the kitchen that will increase the overall cost of that component by <br />approximately $150,000 over the $4,930,389 construction cost cited in the November 14, 2006 <br />abstract. The exact cost of these changes will be reflected in the final pricing assembled by <br />RBC. <br />The Board had previously authorized anot-to-exceed budget of $6,000,000, which was included <br />in the Debt Issuance Schedule presented during the September 14, 2006 work session ($4.5 <br />million/Senior Center, $1.5 million/Sportsplex). As a reminder, the project budget includes <br />owner responsibility items outside of construction, including, but not limited to, construction <br />materials testing, design fees, relocation expenses, teledata wiring, etc. The appropriate Project <br />Ordinance will be presented for Board approval at such time that pricing is complete and the CM <br />at Risk contract terms are finalized. <br />RECOMMENDATION(S): The Manager recommends that the Board receive and approve the <br />information presented; and direct staff to post the final floor plan at the Senior Centers and <br />Sportsplex; and authorize staff to work with Resolute Building Company as the CM at Risk, to <br />solicit bids in anticipation of a final Guaranteed Maximum Price contract for Board approval on <br />May 15, 2007. <br />
The URL can be used to link to this page
Your browser does not support the video tag.