Orange County NC Website
3~ <br />GHAPEL HILL CARRBORC~ CITY SCHOOLS <br />ELEMENTARY SCH®C}L #1 D <br />Value Engineering Analysis and Project Scope Sodifications <br />. of the Multi Prime Construction Bid <br />.Cost Effect <br />Description of Work <br />sustainable Features: ~ ~ _ <br />Building Modifications: . <br />Delete vinyl wallcovering and paint walls <br />Remove exterior split block and use brick <br />Delete all exterior mason ex o ed a's irn <br />HVAC-modify covenngs en ~ <br />HVAC modify AHU firom freeze stat to auto <br />a~,.a~a, rant fsYt, rrPS from 4" deep to 3" deE <br />Delete canopies at 2/3 and 4/5 <br />Site Changes: <br />o.~.,~,,,,,c macnnrv veneer an n <br />Additions per Town of Garrbora CUP Conditions: <br />Add bic cie rack cover er Town of Carrboro <br />~,~+anr~ waikwav in dumpster area per Town of C <br />3a <br />?1 <br />Sub-total (694,741) <br />(634,319) <br />TOTAL <br />