Orange County NC Website
• <br /> 4 <br /> protection, recreational services and an adequate street or road system. He <br /> noted that with! this development. 15-501 would be operating well over <br /> capacity. He continued noting that the recommendation was for denial and to <br /> encourage the applicant to come in with a planned development for the site. <br /> Yuhaszl questioned how would a planned development be appropriate <br /> for this site given the conditions that make a straight rezoning <br /> inappropriate. Be felt that planned development did not address the major <br /> concerns of traffic and water and sewer service. Waldon responded that it was <br /> conceivable that a planned development could come in that would address those <br /> concerns. <br /> Preston inquired if a planned development could be done as the <br /> property is zoned now. Collins responded if it was to be developed at <br /> (one unit to the acre) this could be done with a simple subdivision. This <br /> would need the approval of Chapel Hill and Orange County. Anything other than <br /> R-1 would require a planned development. <br /> Gordon noted that the Chapel Hill ordinance handles a planned <br /> development as a straight Special Use Permit. The Orange County ordinance <br /> handles the planned development as a combination of a rezoning and a Special <br /> Use Permit. <br /> Godschalk asked that Waldon describe the Chapel Hill/Cartboro <br /> Thoroughfare Plant in relation to this proposed project. Weldon responded that <br /> a copy of the Thoroughfare Plan was included in the agenda packet and shows <br /> 15-501 as a major thoroughfare and Old Lystra Road as a minor thoroughfare. <br /> Thus far, attempts to have 15-501 upgraded have been unsuccessful. The Town <br /> of Chapel Hill has attempted to implement this portion of the thoroughfare <br /> plan, but it is still perhaps years away. <br /> Willhoit inquired how the 8 acres in Chapel Hill's jurisdiction are <br /> zoned. Waldon responded R-2 which is 7 units to the acre as Chapel Hill uses <br /> floor area ratio as a guide. Willhoit asked if any special approvals would be <br /> required to buildIon this site and Weldon responded that if a subdivision <br /> proposal came in it would proceed through the regular subdivision process. If <br /> a planned development proposal came in it would go through the Planning Board <br /> and Council. <br /> Jacobs I inquired on what basis the 10 auto tripe per unit per day <br /> was projected. Waldon responded this was the standard trip generation figures <br /> from the Institute of Traffic Engineers for estimated trips per day. <br /> PRESENTATION BY THE APPLICANT <br /> Attorney LeAnn Neese proceeded with the presentation on behalf of <br /> the applicant Gardner Altman, Jr. She stated that the requested rezoning was <br /> compatible with the surrounding uses of property. She noted that the (8) <br /> eight acres in front of the requested rezoning was R-2 which in Chapel Hill's <br /> ordinance is roughly the same as Orange County's R-4 (the requested zoning of <br /> this portion) . She felt that the requested rezoning would bring the 80 acres <br /> into conformity with surrounding uses. She presented a map of Northeast <br /> Chatham County from the Land Development Plan which showed the area which <br /> abuts the Partin Property to be an area they plan for moderate density <br /> residential. She continued that the 80 acres was caught in an area, that for <br /> long range solution, depended on the suitability of the land for wells and <br /> septic systems. She noted the surrounding properties were zoned R-1 and R-2 <br /> (Chapel Hill zoning - which is not the same as Orange County R-1 and B. 2. She <br /> felt that this area would become more urban in the next five years rather than <br /> the next 10 to 20 years. She noted that urban type development was appearing <br /> all around this property. She continued with the application criteria and <br /> presented information that proved. to the applicant's satisfaction. that the <br /> criteria had been met. <br /> Mr. Giles. Ms. Nease's associate, explained the sewer system <br /> planned for the !development. He noted that eventually there would be a <br /> complete on-site gravity fed system. Initially, for development costs and <br /> access, it would be forced pumping from the gravity system off-site to OWASA's <br />