Orange County NC Website
SECTION 4 <br /> Section 4 Scope and Effect <br /> Whenever conflicts exist between federal, state or <br /> local laws, ordinances, or rules , the more restrictive <br /> provision shalt apply . <br /> NOTE: Note this paragraph wilt be added at the end of Section <br /> 4. <br /> SECTION 8 <br /> • <br /> Section 8 Mandatory Standards for Land—disturbing Activity <br /> No land—disturbing activity subject to the control of <br /> this ordinance shall be undertaken except in accordance <br /> with the following mandatory standards: <br /> NOTE: The word "mandatory" will. be added before "standards". <br /> d . Design and Performance of Control Measures — erosion and <br /> sedimentation control measures, structures, and devices <br /> shall be so planned, designed, and constructed as to <br /> provide !protection from accelerated erosion and sedimenta- <br /> tion from the calculated peak rate of runoff from a ten— <br /> year frequency storm . <br /> NOTE: The Words "protection from" will be substituted for <br /> floor:trot of" in the Ordinance. <br /> e. Prior P Lan Approval * No person shall. initiate any Land- <br /> disturbng activity if more than 20,000 square feet is to <br /> be uncovered un Less , thirty or more days prior to initi- <br /> ating the activity, an erosion and sedimentation contro <br /> plan for such activity is filed with, approved by, and a <br /> Grading !Permit obtained from the County. <br /> NOTE: The above paragraph wi IL be added at the end of Section <br /> 8. <br /> SECTION 9 <br /> Section 9 Permanent Downstream Protection of Stream Banks and <br /> Channels <br />