Browse
Search
Agenda - 12-02-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 12-02-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:54:25 AM
Creation date
9/14/2016 10:24:49 AM
Metadata
Fields
Template:
BOCC
Date
12/2/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O6 7f: <br /> ° Implementation Schedule--All major actions identified in the <br /> plan will be placed in chronological order with benchmark dates <br /> attached t, each action to serve as a master schedule for imple- <br /> mentation activities. <br /> With the development of this material, the Consultant will assemble all <br /> project docurneriii tation into a draft report, entitled "Orange County Trans- <br /> - portation Development Plan: 1986 - 1991." The report will be prepared <br /> consistent with the standard outline contained on page 3 of the NCDOT. <br /> guidebook. Note that CGA proposes to use a five-year horizon covering the <br /> period 1986 through 1991, rather than the 1985 through 1990 .specified in <br /> the Request For Proposals. We-believe the proposed time span projected by <br /> CGA will more closely align with grant application deadlines and the pro- <br /> jected completion of the TOP. <br /> Copies of the draft report would be transmitted to the Project Steering <br /> Committee prior to the Corisulant making a presentation at their fourth <br /> meeting. <br /> Task 9: Final Reviews, Modification, and Approvals <br /> (nil" Step 22) <br /> The Consultant will solicit all review comments from the Project Steering <br /> Committee and NCDOT following presentation of the plan to the Committee. <br /> Upon receipt of review comments, the Consultant will incorporate changes, <br /> additions, or modifications arising from the review process into the final <br /> project documeni t. The Consultant suggests that a one-month period be <br /> allowed to incorporate these revisions into the final document. <br /> Task 10: Final Presentation <br /> The Consultant will make the final presentation to the Orange County Board <br /> of Commissionrs. Upon their final acceptance of the report, CGA will <br /> produce 50 copies of the final report for the County, as well as provide a <br /> camera-ready Original from which additional copies may be reproduced. <br /> • <br /> 2-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.