Browse
Search
Agenda - 12-02-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 12-02-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:54:25 AM
Creation date
9/14/2016 10:24:49 AM
Metadata
Fields
Template:
BOCC
Date
12/2/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O56 <br /> Department of Transportation. The purpose of this meeting would be two- <br /> fold: <br /> 1. To discuss, State and local objectives in the TDP update and to deter- <br /> mine priorities for the Consultant's work focus; and <br /> 2. To discuss the study schedule and determine from the NCDOT represen- <br /> tative howl preliminary findings from the planning work will or will <br /> not be used or needed in the submittal and evaluation of Federal grant <br /> applications' --applications whose deadlines will fall prior to the corn- <br /> pletion of the Orange County TDP. <br /> It will be very important for Orange County and the Consultant to under- <br /> stand expectations for each of the two issues outlined above. The NCDOT <br /> process for preparing a TDP has been summarized into a simple 23-step <br /> process; however, each of these steps involves the completion of a myriad <br /> of details in order to address the guidelines if enforced to their fullest <br /> extent. For *ample, virtually the entire budget allocated for this study <br /> could be expended in the examination of Chapel Hill Transit/Orange County <br /> coordination. While this issue is important, Orange County certainly will <br /> have other objeCtives and priorities that the Consultant will also need to <br /> consider. <br /> To complete the TDP within the budget allocated for the project, CCA would <br /> like to define eny local and State priorities at the very onset of the <br /> project. Therefore, this subtask will involve a meeting of the appropriate <br /> Orange County officials and NCDOT representatives as soon as the study <br /> contract is executed as the first step in the study process. The meeting <br /> would be designed to ensure that the Consultant fully understands these <br /> State and local expectations with respect to the available budget. This <br /> process will result in the Consultant being able to respond with •the <br /> appropriate level of effort to the work tasks necessary to successfully <br /> complete the TIT. <br /> Secondly, the Request For Proposals indicates that a preliminary report <br /> will be due by March 1986 and be acceptable to NCDOT in order to apply for <br /> Section 18 funds, if appropriate. If such an interim report can be used <br /> (in place of a completed and approved TDP—and recent experience suggests <br /> that it cannot) to support a grant application, the Consultant will want <br /> to establish a complete understanding of the requirements for this interim <br /> report in order o produce a document that is useful to Orange County offi- <br /> cials. The Consiultant proposes to also address in this preliminary meeting <br /> all issues of the overall study schedule in relation to the production of <br /> this interim report. <br /> Subtask 1.2—Conduct Initial Steering Committee Meeting. As soon as <br /> practical after the initial study management meeting, the Consultant will <br /> meet with the Project Steering Committee. The primary purpose of the- <br /> 2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.