Browse
Search
Agenda - 12-02-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 12-02-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:54:25 AM
Creation date
9/14/2016 10:24:49 AM
Metadata
Fields
Template:
BOCC
Date
12/2/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> O5 <br /> TECHNICAL APPROACH <br /> • <br /> CGA's proposed scope of work for this project will, pursuant to the Request <br /> For Proposals, correspond to the standard outline for TDP preparation out- <br /> lined in "Transportation Development Planning for Non-Urbanized Areas: A ' <br /> Guidebook for Local Governments and Service Providers." The 23 steps con- <br /> tained in this NCDOT guidebook are embodied in our ten consecutive work <br /> tasks. In several cases, CGA has combined NCDOT steps to take advantage of <br /> on-site presence of the Consultant in order to carry out the study in a <br /> manner as economically efficient as possible. <br /> The following Idescription of the proposed work program follows the outline <br /> of work detailed in our letter, dated September 18, 1985. In order to <br /> demonstrate comparability between the proposed work program and the NCDOT • <br /> process, each of the NCDOT steps are listed in parenthesis under each CGA <br /> task heading. <br /> WORK PROGRAM <br /> • <br /> Task 1: Study Organization and Introductory Steering Committee <br /> Meeting (TDP Steps 1 and 2) <br /> This task will set the direction for the remainder of the .study effort. <br /> CGA will approach these introductory work efforts by addressing two key <br /> subtask s <br /> Subtask 1.1—Study Organization. This subtask is particularly important, <br /> given the complexity and diversity of conditions and the availability of <br /> existing transortation services in Orange County. In this task, the <br /> Consultant proposes to hold an initial meeting with the project director <br /> from Orange County and the technical representative from the North Carolina <br /> 2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.