022 - . r
<br /> •in, anal ses of the Owner's needs . . structinn, and furnishing services as may be required in
<br /> . • connection with the replacement of such.Work. •
<br /> t 1.7.2 Providing financial feasibility or .other special 1.7.16 Providing services made necessary by die default
<br /> , .ladle;. of the Contractor, or by major defects or deficiencies in
<br /> 1.7.3 Providing plannin SurvC s site evaluations, envi- the Work of the Contractor,or by failure of performance
<br /> gl y ■,, of either the Owner or Contractor under the Contract for
<br /> ronmental studies or comparative studies of prospective
<br /> Construction,
<br /> j site and preparing special surveys, studies and wino's-
<br /> oars required for appcovals of governmental authorities 1.7.17 Preparing a set of reproducible record drawings
<br /> or athlas having jurisdiction over the Project. showing significant changes in the Work made during
<br /> ■ services relative to future facilities, sys- construction based on marked-up prints, drawings and
<br /> 1.7.4 Providing other data furnished by the Contractor to the Architect.
<br /> toms and equipment which are not intended to be con- 1,7.i6 Providing extensive assistance in the utilization of
<br /> structed during the Construction Phase. - b
<br /> any equipment ur system such as initial start-up or testing.
<br /> . 'roviding services tip investigate existing conditions adjusting and balancing, preparation of operation and
<br /> or facilities o - measured draw'.' • ,or to maintenance manuals, training personnel for operation
<br /> verify the accurac . • - information fur-
<br /> . and maintenance,and consultation during operation. --
<br /> / e a a•ner. ( 1.7.19 Providing services after issuance to the Owner of
<br /> 1.74 Preparing documents of alternate, separate or the final Certificate for Payment, Or in the absence of a
<br /> sequential bids or providing extra services in connection final Certificate for Payment, more than sixty days after
<br /> with bidding. negotiation or construction prior to the the Date of Substantial Completion of the Work.
<br /> completion of the Construction Documents Phase,when
<br /> requested by the Owner.' 1.7.20 Preparing to serve or serving as an expert witness
<br /> in connection with any public hearing, arbitration pro-
<br /> 1.7.7 Providing coordination of Work performed by seeding or legal proceeding.
<br /> separate contractors or by�the Owner's own forces. 1.7.21 Providing services of consultants for other than
<br /> . 1.7.0 Providing services in connection with the work of the normal architectural,structural; mechanical and elec-
<br /> a construction manager Or separate consultants retained trical engineering services for the Project.
<br /> by the Owner. I 1.7.22 Providing any other services not otherwise in- -
<br /> 1.7.9 Providing Detailed Estimates of Construction Cost, eluded in tills Agreement or not customarily furnished in
<br /> analyses of owning and operating costs,or detailed quan-
<br /> tity surveys or inventories of material, equipment and to TIME
<br /> labor.
<br /> 1.8.1 The Architect shalt-perform Basic and Additional
<br /> J Providing interior, design and other similar s -;-, Services as expeditiously as'is consistent with professional
<br /> . %ices require - '• connection se ection, skill and care and the orderly progress of the Work.Upon •
<br /> 1 ' procurement or inst • . - u ' • • ishings and request of the Owner, the Architect shall submit for the
<br /> - ret1 • - • ent. Owner's approval a schedule for the performance of the
<br /> 1.7.11 Providing services for planning tenant or rental Architect's services which shall be adjusted as required as
<br /> spares. the Project proceeds,and shall include allowances for pert- -
<br /> 1.7.12 /staking,revisions in Drawings, Specifications or
<br /> oils of time required for the Owner's review and approval
<br /> k rather clue contents revisions
<br /> when such revisions are inconsistent of submissions and for approvals of authorities having
<br /> jurisdiction over the Project.This schedule,when approved
<br /> with written approvals or instructions previously given, by the Owner, shall not, except for reasonable cause, be
<br /> are required by the enactment or revision of codes, laws
<br /> or regulations subsequent Ito the preparation of such doc- exceeded by the Architect.
<br /> ° unlents or are due to other causes not solely within the
<br /> control of the Architect. ARTiCLE 2
<br /> 1.7.13 Preparing Drawings,Specifications and supporting THE OWNER'S RESPONSIBILITIES
<br /> data and providing other services in connection with •
<br /> 'Change Orders to the extent that the adjustment in the 2.1 The Owner shall provide full information regarding
<br /> Basic Cumpensation resulting from the adjusted Con- requirements for the Project including a program, which •
<br /> structinn Cost is not commensurate with the services re- shall set forth the Owner's design objectives, constraints -
<br /> quired of the Architect,provided such Change Orders are and criteria, including space requirements and relation-
<br /> required by causes not solely within the control of the ships,flexibility and expandability,special equipment and
<br /> Architect. I systems and site requirements.
<br /> 1.7.14 Making investigations, surveys, valuations, invert- 2.2 If the Owner provides a budget for the Project it
<br /> tories or detailed a uaisals of existing facilities, and serv- Khali include contingencies for bidding;, changes in the
<br /> ices required in connection with construction performed Work during construction, and other coats which are the
<br /> by the Owner, responsibility of the Owner, including those described in
<br /> this Article 2 and in Subparagraph 3.1.2.The Owner shall.
<br /> - 1.7.15 Providing consultation concerning replacement of at the request of the Architect, provide a statement of
<br /> any Work damaged by f Ire or other cause during con- funds available for the Project,and their source.
<br /> AIA DOCUMENT am •OWNLx•AKCl11IL.C1 ACx[LMLNI •IIUKILLNIII[)1111)51• JULY i777•AIM.•0197?
<br /> Mk AMERICAN INSUiUiE of AKCNITECIS, MS NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 8141.1977 S
<br /> .
<br /> •
<br />
|