Browse
Search
Agenda - 12-02-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 12-02-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:54:25 AM
Creation date
9/14/2016 10:24:49 AM
Metadata
Fields
Template:
BOCC
Date
12/2/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> other projects,for additions to this Project,or for comple- 10.4 Termination Expenses include expenses directly at- <br /> tion of this Project by others provided the Architect is not tabulable to termination for which the Architect Is not <br /> in default under this Agreement, except by agreement in otherwise compensated, plus an amount computed as a <br /> writing and with appropriate compensation to the Archi- percentage of the total Basic and Additional Compensa- <br /> tion earned to the time of termination,as follows: <br /> 8.2 Submission or distribttion to,meet official regulatory .1 20 percent if termination occurs during the Sche- <br /> requirements or for other purposes in connection with the matic Design Phase;or <br /> Project is-not to be construed as publication in derogation .2 10 percent if termination occurs during the Design <br /> of the Architect's rights. <br /> Development Phase;or <br /> i .3 5 percent if termination occurs during any subse- <br /> ARTICLE 9 quent phase. <br /> ARBITRATION - ARTICLE 11 <br /> 9.1 All claims, disputes a d other matters in question <br /> between the parties to this Agreement, arising out of or MISCELLANEOUS PROVISIONS <br /> relating to this Agreement or the breach thereof, shall a may 11.1 Unless otherwise specified,this Agreement shalt be <br /> decided by arbitration in accordance with the Construe- governed by the law of the principal place of business of <br /> un Industry Arbitration Rites of the American Arbitra- the Architect. <br /> lion Association then obtai}ring unless the parties mutu- 11.2. Terms in this Agreement shall have the same mean- <br /> ally agree otherwise. No arbitration, arising out of or re- ing as those in AIA Document A201, General Conditions <br /> lating to this Agreement, shall include, by consolidation, of the Contract for Construction, current as of the date <br /> joinder or in any other manner,any additional person not of this Agreement. <br /> a party to this Agreement except by written consent con- 11.3 As between the parties to this Agreement: as to all <br /> taining a specific reference to this Agreement and signed acts or failures to act by either party to this Agreement, <br /> by the Architect, the Owner)and any other person sought any applicable statute of limitations shall commence to <br /> to be joined. Any consent to arbitration involving an ad- <br /> ditional person or persons shall not constitute consent to run and any an any and al of action not latl t deemed <br /> � e. <br /> arbitration of any dispute not described therein or with vant Date of Substantial al Completion of the 1 orkh l <br /> and as <br /> any person not named or described therein. This Agree- to any acts or failures to act occurring after the relevant <br /> meet to arbitrate and any agreement to arbitrate with an Date of Substantial Completion,not later than the date of <br /> additional person or persons duly consented to by the issuance of the final Certificate for Payment. <br /> parties to this Agreement shall be specifically enforceable <br /> under the prevailing arbitration law. 11.4 The Owner and the Architect waive all rights <br /> 9.2 Notice of the demand far arbitration shall be filed in against each other and against the contractors, consult- <br /> 9.2 Notice the other demand <br /> to this t Aion shall and with ants,agents and employees of the other for damages cov- <br /> the American Arbitration Association. The demand shall ered by any property insurance during construction as set <br /> Con- <br /> be made within a reasonable'time after the claim,dispute <br /> forth s, the edition of AIA date of Document this Agreement.eenernt C he <br /> or other matter in question has arisen. In no event shall ditions, current as of the date of this Agreement. The <br /> the demand for arbitration bile made after the date when similar and the Architect each shall require Con appnts and <br /> institution of legal or equitable proceedings based on similar waivers from their contractors, consultants and <br /> such claim, dispute or other'natter in question would be agents. <br /> barred by the applicable statute of limitations. <br /> 9.3 The award rendered by the arbitrators shall be final, ARTICLE 12 <br /> and judgment may be enter° upon it in accordance with SUCCESSORS AND ASSIGNS <br /> applicable law in any court having jurisdiction thereof. 12.1 The Owner and the Architect, respectively, bind <br /> themselves, their partners, successors, assigns and legal <br /> ARTIC !: 10 representatives to the other party to this Agreement and <br /> to the partners, successors, assigns and legal representa- <br /> TERMINATION OF AGREEMENT tives of such other party with respect to all covenants of <br /> 10.1 This Agreement may be terminated AGREEMENT <br /> either party this Agreement.Neither the Owner nor the Architect shall <br /> upon seven days' written no'ice should the other party without sublet or n transfer <br /> consent t interest in this Agreement <br /> fail substantially to perform ip accordance with its terms without the written consent of the other. <br /> through no fault of the party initiating the termination. <br /> 10.2 This Agreement may be terminated by the Owner ARTICLE 13 <br /> upon at least seven days' written notice to the Architect EXTENT OF AGREEMENT <br /> in the event that the Project is permanently abandoned. <br /> 10.3 In the event of termination not the fault of the Ar- 13.1 This Agreement represents the entire and integrated <br /> chitect,the Architect shall in be ion not the fault <br /> all services the agreement between the Owner and the Architect and <br /> performed to termination date, together with Reimburs- supersedes all prior negotiations,representations or agree- <br /> able Expenses then due and ill Termination Expenses as meend dither written or Oran This Agreement may <br /> defined in Paragraph 10.4. p amended only by written instrument signed by both <br /> Owner and Architect. <br /> 8 8141-1977 AIA DOCUMENT 5141•OWNER•AI:CIIITECT AGREEMENT•THIRTEENTH EDITION•NW 1.07•MO•01977 <br /> THE AMERICAN INSTITUTE Or ARCHITECTS, 1735 NEW YORK AVENUE, NAV., WASHINGTON. D.C. 20006 <br /> t � <br />
The URL can be used to link to this page
Your browser does not support the video tag.