Orange County NC Website
fit <br /> TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> z,Y <br /> ra, <br /> ARTICLE 1 ments to previous Statements of Probable Construction <br /> ARCHITECT'S SERVICES AND RESPONSIBILITIES Cast indicated by changes in requirements or general <br /> market conditions. <br /> BASIC SERVICES 1.3.4 The Architect shall assist the Owner in connection <br /> with the Owner's responsibility for filing documents re- <br /> phases Architect's Basic Services consist of the five y g <br /> phases described in Paragraphs 11 through 1.5 and quired for the approval of governmental authorities hay- <br /> include normal structural, mechanical and electrical ing jurisdiction over the Project. <br /> engineering services aiid any other services included 1,4 BIDDING OR NEGOTIATION PHASE • <br /> , in Article 15 as part of Basic Services. <br /> i 1A.1 The Architect, following the Owner's approval of <br /> *: 11 SCHEMATIC DESIGN PHASE the Construction Documents and of the latest Statement <br /> 111 The Architect shall review the program furnished of Probable Construction Cost, shall assist the Owner in <br /> ' by the Owner to ascertain the requirements of the Project obtaining bids or negotiated proposals, and assist in <br /> and shall review the undel•standing of such requirements awarding and preparing contracts for construction. <br /> with the Owner. 15 CONSTRUCTION PHASE—ADMINISTRATION <br /> 11.2 The Architect shall provide a preliminary evalua- OF THE CONSTRUCTION.CONTRACT <br /> tion of the program and the Project budget requirements, 1,5.1 The Construction Phase will commence with the <br /> each in terms of the other,subject to the limitations set <br /> award of the Contract for Construction and,together with <br /> forth in Subparagraph 3.2.1 the Architect's obligation to'provide Basic Services under <br /> 1.1.3 The Architect shall review with the Owner alterna- this Agreement,will terminate when final payment to the <br /> tie approaches to design and construction of the Project. Contractor is due, or in the absence of a final Certificate <br /> . <br /> 11.4 Based on the mututly agreed upon program and for Payment or of such due date,sixty days after the Date <br /> Project bud g et re q uiremerr ls the Architect shall p re p are, of Substantial Completion letion of the Work,whichever occurs <br /> for approval by the Owner <br /> Schematic Design Documents first. <br /> consisting of drawings and other documents illustrating 1.5.2 Unless otherwise provided in this Agreement and <br /> the scale and relationship of Project components. incorporated in the Contract Documents, the Architect <br /> t:µ 113 The Architect shalllsubmit to the Owner a State- shall provide'administration of the Contract for Construc- <br /> ment of Probable Construction Cost based on current lion as set forth below and in the edition of A{A Docu- <br /> area,volume or other unit costs. ment A201, General Conditions of the Contract for Con- <br /> struction,current as of the date of this Agreement. • <br /> 1,2 DESIGN DEVELOPMENT IPHASE <br /> 13.3 The Architect shall be a representative of the <br /> i 1.2.1 Based on the approved Schematic Design Docu- <br /> pp � Owner during the Construction Phase, and shall advise <br /> meets and any adjustments authorized by the Owner in and consult with the Owner. Instructions to the Contrac- <br /> tile program or Project budget, the Architect shall pre- for shall be forwarded through the Architect. The Archi- <br /> pare, for approval by thel Owner, Design Development tect shall have authority to act on behalf of the Owner <br /> .` Documents consisting of drawings and other documents only to the extent provided in the Contract Documents <br /> " unless otherwise modified by written instrument in ac- <br /> to fix and describe the size and character of the entire <br /> Project as to architectural,'structural,mechanical and elec- cordance with Subparagraph 13.16. <br /> ; tric.11 systems, materials arid such other elements as may 13.4 The Architect shall;visit the site at intervals ap- <br /> be appropriate. propriate to the stage of construction or as otherwise, <br /> 1.2.2 The Architect shall submit to the Owner a further agreed by the Architect in writing to become generally <br /> Statement of Probable Construction Cost. familiar with the progress and quality of the Work and to <br /> determine in general if the Work is proceeding in accord- <br /> 1,3 CONSTRUCTION DO MENTS PHASE p g <br /> ante with the Contract Documents. However, the Archi- <br /> 1.3.1 Based on the approi ed Design Development Doc- tect shall not be required to make exhaustive or con- <br /> . uments and any further adjustments in the scope or qual- tinuous on-site inspections to check the quality or quan- <br /> ay of the Project or in the Project budget authorized by lily of the Work. On the basis of such on-site observa- <br /> $„ the Owner, the Architect I shall prepare, for approval by Lions as an architect, the Architect shall keep the Owner <br /> the Owner,Construction Documents consisting of Draw- informed of the progress and quality of the Work, and <br /> ings and Specifications setrImg forth in detail the require- shall endeavor to guard the Owner against defects and <br /> Inenis for the construction of the Project. deficiencies in the Work•of the Contractor. <br /> 1.32 The Architect shall assist the Owner in the prepara- 13.5 The Architect shall not have control or charge of <br /> Lion of the necessary bidding information,bidding forms, and shall not be responsible for construction means, <br /> the Conditions of the ,Contract, and the form of Agree- methods, techniques, sequences or procedures, or for <br /> Y1 ment between the Owner and the Contractor, safety precautions and programs in connection with the <br /> 1.3,3 The Architect shall aI dvise the Owner of any adjust- Work, for the acts or omissions of the Contractor, Sub- <br /> AIA DOCUMENT 8141•OWNER-ARCHITECT AGREEMENT• THIRTEENTH COITION• JULY 1977•AIAT1•®1977 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1725 NEW YORK AVENUE, N.w., WASHINGTON, D.C. 20i106 0141.1977 3 <br />