Orange County NC Website
,._ ! <br /> 12 - • <br /> . • • . 4 <br /> I <br /> " Durham Construction Company, Inc. Phone 9191471-4497 <br /> - -r.- <br /> 112 Britania Avenue <br /> ...Joe,.., <br /> • <br /> fr turtO. I Post Office Box 15028 <br /> ••....• <br /> • <br /> N.C.Lie.*6533 Durham,North Carolina 27704.0028 <br /> November 15, 1985 . • <br /> . . <br /> . . <br /> • Roman Kolo ij , Architects . . <br /> 121 South stes Drive . . <br /> Chapel Hill , North Carolina 27514 <br /> . . <br /> Re i Hillsb rough Courthouse Renovation • <br /> Hillsbcirough, North Carolina • <br /> Dear Mr. KcIlodij: <br /> - <br /> There are some problems that we need clarifications from the . <br /> , . . 1 <br /> owner on b +ore we can proceed with our work. • <br /> • <br /> • - <br /> 1 . The lexisting base that was in room 109 is not the <br /> tirM-( i'te•-• <br /> right quantity or size for us to reinstall . We need - <br /> = to have Garland Woodcraft to make the following • <br /> ; • materials. <br /> Breakdown: . <br /> . . <br /> . . . <br /> - Wood base 107LF @ $2.08/LF $ 222.56- <br /> 1 <br /> Wood shoe mold 1O7LF @ $.21/LF 22.47 <br /> b.c.c. Labor to install • no charge . . <br /> Subtotal 245.03 <br /> - D.C.C. Overhead 107. 24.50 • <br /> Subtotal 269.53 <br /> D.C.C. Profit 10% 26.95 <br /> Total Additions $296.46 -&-- <br /> • <br /> 2. Addilg steel support plate over window at room 109. <br /> A tel support plate needs to be install to support <br /> itM14, el the 6xterior brick veneer above the window at room <br /> 109. <br /> Breakdown: . <br /> I <br /> • Removing existing cracked brick <br /> eneer 25.00 <br /> Support steel lintel 49.00 <br /> . . <br /> Installing lintel 20.00 <br /> • reinstalling 4-intel Vi,:. ' 120.00 <br /> Subtotal . 5:-.. . :- 214.00 <br /> D.C.C. Overhead 2140 <br /> Subtotal - 235.40 <br /> D. C.C. Profit <br /> ....„,....,_ . . <br /> Total Addition $258.94 < - <br /> 3. The existing floor that supports the existing large "Bell - <br /> I <br /> Clock" has decayed and is sagging. This floor needs to be <br /> I <br /> rebuilt to support the clock. Please advise us on what <br /> method you would like for us to use on the re-construction <br /> I <br /> . • <br />