Orange County NC Website
7' CHANGE i <br /> Distribution to: <br /> ORDER I <br /> OWNER Pg • <br /> I ARCHITECT 53 .: <br /> ), ' "AlA DOCUMENT G701 CONTRACTOR Pg . <br /> E3 <br /> Flap . <br /> OTHER fal FILE <br /> • —......... — •••••......now........r......1.vor.o. •■•■■••••■•■•••••• . .M.A.O. <br /> , <br /> PROJECT: REN0VAITiONS: CHANGE ORDER NUMBER: 5.03 <br /> -:-. <br /> (name,address) ORANGE COUNTY HISTORIC <br /> : • <br /> COURTHOUSE INiTIATION DATE: DEC 3, 1985 <br /> •, TO (Contractor): Hi LLSBOROI UGH NC - <br /> :1; I ARCHITECTS PROJECT NO oc.a <br /> -7,' • DURHAM CONSTRUCTION CO INC . <br /> ••• . <br /> 4 112 BRITTANIA AVE CONTRACT FOR: GENERAL <br /> - P.O.MOX 15028 CONSTRUCTION <br /> DURHAM NC 27704 0028 <br /> CONTRACT P/0 ID NO. 7741 CONTRACT DATE: MARCH 20, 1989 <br /> ' I • . <br /> You are directed to make Ile following changes in this Contract: <br /> 1. INSTALL STEEL LINTEL AND RESTORE DETERIORATED BRICKWORK ABOVE <br /> 1 <br /> - . EXISTJNG WINDOW OPENING OUTSIDE ROOM 109 . $ 258.94 <br /> , . . <br /> 2. PROVIDE NEW WOOD BASE AND SHOE MOULD MATERIALS, <br /> . MATCHING EXISTING PROFILES, TO REPLACE MODIFIED <br /> EXISTING MEMBERS IN ROOM 109 . $ 296.48 - <br /> " I <br /> 3. PERFORM LEVELING OF EXISTING CONCRETE SUB-FLOOR • <br /> 1 <br /> IN HALL 110 AND LOSEY 101 , USING ARDEX K-15 LATEX <br /> , 1 <br /> CONCRETE LEVELING COMPOUND iKY% • - <br /> 4 c+sTRucT STORAGE CLOSET IN ROOM 208 (CLERK'S OFF. ) <br /> INCLUDING PAIR OF WOOD PANEL DOORS, AS DETAILED ay <br /> ARCHITECT. . $1653.07 <br /> 5. INSTALL CARPET FLOORING IN JUDGE'S CHAMBER (RM 105 ), <br /> JUpGE'S OFFICE (RM 104) . SEC. OFFICE (RM 103) IN PLACE <br /> OF VINYL TILE ORIGINALLY SPECIFIED (CREDIT FOR TILE) . <br /> • I <br /> (CARPET PRICE AT 23.00/SY AS SPEC. IN ALLOWANCES) . SI 0 98.68 <br /> • i <br /> TOTAL ITEMS 1 - 5 --"". 55.1. 0*-- 5361,11 <br /> I <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indilrate his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br /> ), I • . <br /> The original (Contract Sum) (Guaranteed Maximum Cost) was $ 247 700.00 . <br /> = Net change by previously authorized Change Orders ,.. $ 10 262.17 . <br /> The(Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 257 982.17 <br /> The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (dec-reased)-(unchanged) <br /> by this Change Order 1 $ _§.....-s-6-8-71/17 54C,I.11 Kle... <br /> . <br /> ,• The new(Contract Sum) (Guaranteed Maximum Cost)including this Change Order will be $ 263 5 3 t .07 eCo i 2,0•.5.4 . <br /> The Contract Time will be (ncreased) (decreased) (unchanged) by ( 0 ) Days. <br /> , The Date of Substantial Con-pletion as of the date of this Change Order therefore is JAN 10 S986 ' <br /> Authorized: <br /> c- ROMAN KoLODIJ ' JAMES WEBB DURHAM CONSTRUCTION CO INC <br /> COUNTY OF ORANGE <br /> ARCHITECT i <br /> AITCHITEcTS CONTRACTOR OWNER NORTH CAROLINA <br /> : Address 201 E RoSEMA114Y ST Address P.O. BOX 15 o 28 Address 108 E MARGARET LANE <br /> CHAPEL HILL INC 27514 <br /> DURHAM NC 27704 0028 HILLSBOROUGH NC <br /> 8 Y //4 /4(7,gie A BY .AY.e,1-1,-, <br /> - , 1,.... .... <br /> .... BY Al t...•.,....„ w,Ja.>e- <br /> .,. <br /> a DATE if.kr, '267 .-t--- DATE / - 0 3 - 7 .6 DATE <br /> '-' <br /> AlA DOCUMENT C701 • CHANGE ORDER • APRIL 1978 EDITION • AIA • 0 1970 <br /> k THE AMERICAN INSTITUTE OF AkHITECTS,1735 NEW YORK AVE..N.W.,WASHINGTON.DC.2000(. G701—1978 <br /> ‘`,• 7 <br /> , <br /> . • \... <br />