Browse
Search
Agenda - 11-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:47:53 AM
Creation date
9/14/2016 9:32:27 AM
Metadata
Fields
Template:
BOCC
Date
11/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q <br /> r� <br /> ARTICLE B 2 tt SPECIFIC STANDARDSJALL SPECIAL USES ("Yes`.' indicates compliance; 1110" indicates noncompliance) C1y� <br /> Planning Staff Planning Board <br /> Ordinance Requirements Findings Evidence Submitted to Support Findings Findings <br /> Article B.2.4 requires the applicant <br /> to address the following: <br /> a) Method and adequacy of provision X Yes No Letter-shav_e_been_rece_i_v-ed_by the Yes Ito----- <br /> - for sewage disposal facilities, appropriate state agencies for the <br /> solid waste and water service community water system and spray <br /> irrigation wastewater disposal system <br /> proposed. Further approvals will need to <br /> be obtained .at the final plan stage. <br /> b) Method and adequacy of.police, X Yes No Fire protection, police and rescue Yes No <br /> fire and rescue: squad protec- are to be provided by the Eli Whitney <br /> Lion Volunteer Fire Department, Orange County <br /> Sheriff's Department and the South Orange <br /> Rescue Squad respectively. (See attached <br /> correspondence.) <br /> c) Method and adequacy of vehicle X Yes No The Orange County Planning Staff has Yes No <br /> access to the site and traffic projected an additional 502 trips per day <br /> conditions around the site for the project. This projection is based on 75 <br /> additional mobile homes times a multiplier of 6.7 vehicle <br /> trips per dwelling per day. The most recent traffic <br /> count is a 19$1 count at the intersection of Butler. (toad <br /> and White Cross Road which indicated 500 trips per- day. <br /> DOT recommends improving the sight distance looking north <br /> by cutting back the brush on the backslope to the north <br /> of the entrance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.