Browse
Search
Agenda - 11-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:47:53 AM
Creation date
9/14/2016 9:32:27 AM
Metadata
Fields
Template:
BOCC
Date
11/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,I 00'0067 <br /> ,, CallagejaHOrn <br /> } <br /> . <br /> Table 2. provides the resulting trip ends for the project for both Average <br /> I Daily Traffic(ADT) conditions and for A.M. and P.M. peak <br /> hour conditions.. <br /> Under fulk development,.Scatswood will have-5,700 trips to the site and 5,700 • <br /> trips away from the site on an.average day. The A.M. peak hour traffic will <br /> be 200 tr�ps.to the site and 400 trips away from the site. P.M.peak hour <br /> traffic will be 640 trips to the site and 300 trips away from the site. Trip <br /> generations for Scotswood is summarized in Table 2 below. <br /> j <br /> j TABLE 2 • <br /> TRW.GENERATION SUMMARY <br /> ADT AM Peak Hour PM Peak Hour <br /> Enter Exit Enter Exit Enter Exit <br /> Single Family Dwellings 2,100 2,100 90 230 570 . 160 <br /> Apartments 650 650 . 20 90 100 50 <br /> ■ Shopping Center 2-,950 2,950 90 80 270 290 <br /> Total 5,700. 5,700 200 400 640 500 <br /> u. V. TRAFFIC DISTRIBUTION AND.ASSIGNMENT <br /> 1 The trip ends estimated in. Section-. IV were assigned to the streets. and <br /> � thocou gh es serving the proposed project. The distribution of trips by <br /> g <br /> direction. was derived from existing travel <br /> � patterns; projected future travel <br /> I •patterns, land the spatial distribution of employment and other travel i <br /> I <br /> r ! opportunities in the Research Triangle area. . 1 <br /> ! i <br /> Figure 3 shows existing (1983 and 1984) average daily and P.M. peak hour I <br /> traffic on the existing major thoroughfare system serving the project. Also <br /> shown are a additional traffic volumes that would be added by Scotswood. <br /> E ' Scotswood ould add 1,725 daily trips to St. Marys Road,east of the project <br /> and 3,450 trips to St. Marys Road west of the project. An additional 4,025 <br /> -6- <br /> • 1 <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.