Browse
Search
Agenda - 11-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:47:53 AM
Creation date
9/14/2016 9:32:27 AM
Metadata
Fields
Template:
BOCC
Date
11/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r i <br /> 000031 <br /> §.` IMPACT STATEMENT FOR SCOTSWOOD PAGE 4 <br /> 5. Proposed Developments H.i�rh/Medium Scen rips <br /> a. Spotswood <br /> � a 410 single family units. . . 184,500/123,000 GPD <br /> o 216 multifamily units (2 bedrms <br /> per unit) 64,800 GPD <br /> o ESTIMATED USE 248,300/187,800 GPO <br /> b . Wildwood Section IV <br /> o 28.80 acres, R-4 zoning <br /> o Assume 24.48 acres developed (c) <br /> o TOTAL: 88 units 44,100/29,400 GPO <br /> TOTAL ESTIMATED USE 293,400/217,200 GPO <br /> WATER TREATMENT PLANT: <br /> 6 REMAINING CAPACITY 787,600/931 ,600 GPO <br /> �p % OF PLANT CAPACITY USED 74% / 69% <br /> WASTEWATER TREATMENT PLANT: th) <br /> o REMAINING CAPACITY l£) (g) 387,600/531 ,800 GPO <br /> o % OF PLANT CAPACITY USED 81% / 73% <br /> (a) Assumil 150 gallons per day (GPD) per bedroom. <br /> (b) High scenario— 3 bedrooms per dwelling unit; medium <br /> scenario— 2 bedrooms per dwelling unit . Both scenarios <br /> were used, unless a site plan specified the number of <br /> bedrooms per unit . Assumed 2 bedrooms per mobile home. <br /> (c) Subtracted out 15% for roads. <br /> (dl "Sewer System Fesibility Study for Central Orange Study <br /> Area". E-C Maguire, Inc. May, 1985. <br /> tel Subtracted out 5 mobile homes for which building permits <br /> have been issued. <br /> [fl Assumed 150 GPO of wastewater (per bedroom) is treated. <br /> (g) These figures do not account for groundwater <br /> infiltration into the sewer lines . <br /> Chl These figures do not reflect the amount of wastewater <br /> treatm nt capacity earmarked for the Efland area . The <br /> initial capacity set aside for the EfLand area will be <br /> 55,000 GPD, and will eventually be expanded to 325,000 <br /> GPO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.