Browse
Search
Agenda - 11-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:47:53 AM
Creation date
9/14/2016 9:32:27 AM
Metadata
Fields
Template:
BOCC
Date
11/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
000029 <br /> IMPACT STATEMENT FOR SCOTSWOOD PAGE 2 <br /> the intersection of St . Mary's Road and Thomas Ruffin <br /> St. Eight (8) inch line within the project area will <br /> tie into the 8 inch force main at the pump station <br /> Located south of Nancy Hill Creek. <br /> — Eight [8) inch Line ties into a two (2) inch force main <br /> at trio second pump station located near the northeast <br /> corner of the site. <br /> The capacity of the Hillsborough water treatment plant is 3.0 <br /> 11 <br /> MOD, of which 47% is being utilized. The wastewater <br /> • treatment plant, which has a capacity to treat 2.0 MGO, is <br /> currently Operating at 40% (800,000 GPO) of its capacity. <br /> Water use and sewage treatment estimates were derived for <br /> approved and proposed developments to determine the remaining <br /> capacities for both the water treatment plant and wastewater <br /> treatment plant (see attachment) . Assuming the "high <br /> scenario" listed in the attached calculations for the <br /> Scotawood development, the water treatment plant • would be <br /> operating itt 72% of its capacity and the Wastewater Treatment <br /> Plant at 78% of its capacity . <br />
The URL can be used to link to this page
Your browser does not support the video tag.