Browse
Search
Agenda - 11-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:47:53 AM
Creation date
9/14/2016 9:32:27 AM
Metadata
Fields
Template:
BOCC
Date
11/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
000028 ORANGE COUNTY PLANNING DEPARTMENT <br /> HILLSBOROUGH <br /> NORTH CAROLINA <br /> 27278 <br /> oti ar <br /> ,010.111, <br /> "771 <br /> "1ft:a <br /> 41 .0 <br /> 'a ago' <br /> MEMORANDUM <br /> TO: ORANGE COUNTY PLANNING BOARD <br /> FROM: EDDIE KIRK AND LAURA HILL, PLANNERS <br /> DATE: NOVEMBER 16, 1985 <br /> SUBJECT: ' MPACT STATEMENT FOR SCOTSW000 DEVELOPMENT <br /> A. WATER , ND SEWER SERVICES <br /> Water distribution and sanitary sewer plans (dated October, <br /> 18853 forlScotswood were approved by Hillsborough 's water <br /> plant superintendent and water commissioner. Water pressure <br /> was also checked and proved to be adequate to serve the <br /> project. 1On November 18, 1985, subsequent to the site plan <br /> approval, the Town Board agreed to provide public water and <br /> sewer services to the project. <br /> The Location and size of the major water and sewer lines <br /> proposed to serve the site are as follows: <br /> 1 . Water: <br /> — Ten E10) inch Line from US 70 ties in at Scotswood <br /> Bouleiiard and follows Scotswood Boulevard to Graham <br /> DriveJ <br /> — Eight (8) inch line along Woodlawn Drive within project <br /> area ties into existing six (6) inch line at Miller <br /> Road. <br /> — Six (61 inch line ties into existing six (6) inch line <br /> on St . Mary 's Road, and eight (81 inch line along Graham <br /> Drive within project area. <br /> 2. Sanitary Sewer: <br /> — ALL lines within the project are to be eight (8) inches. <br /> — Six (61 inch force main along St. Mary 's Road will <br /> extend approximately 4000 feet to existing manhole at <br />
The URL can be used to link to this page
Your browser does not support the video tag.