Orange County NC Website
• <br /> 000215 <br /> 000223 <br /> 000042 <br /> NCDOT directly. Now, NCDOT will not accept such plats <br /> unless submitted by the Planning Department. Upon <br /> receipt, NCDOT review takes from 10 to 18 working days <br /> (14-24 calendar days) to complete. <br /> 2. Orange County Health Department (or applicable <br /> public utility provider in case of public system <br /> connection — OWASA, Hillsborough, Orange—A Lamanca, etc.) . <br /> The Orange County Health Department receives applications <br /> for Lolt tests directly from the developer. Given the <br /> present work load of the sanitarians, completion of the <br /> lot tests will require from 14-21 calendar days. <br /> Public utility providers such as OWASA end the Town of <br /> Hillsborough will accept applications for review <br /> directly. The time required for such review will also <br /> vary from 14-21 calendar days. <br /> 3. Oranges County or Chapel Hi lL/Carrboro Board <br /> of Education . <br /> Responses from Boards of Education have rarely been <br /> received. Only recently was a comment received, that <br /> being In regard to the proposed Scotswood rezoning. The <br /> response came from the Orange County Board of Education <br /> and was received approximately 30 calendar days after the <br /> request for comment . <br /> 4. OrangeiSail and Water Conservation District <br /> tgenerol soils description and interpretation) . <br /> Subdivision plats were submitted at one time to the Soil <br /> and Water Conservation District for review and comment. <br /> Due to the Lack of response, this practice was <br /> discontinued. Since the submission is a requirement of <br /> the Subdivision Regulations, it is being initiated again . <br /> 5.. Erosion Control Officer (sediment control <br /> and stormwater management). <br /> Preliminary subdivision plats are currently reviewed by <br /> the Erosion Control Officer upon submission by the <br /> applicant. The normal review period varies from 4 to 14 <br /> calendr days depending upon the complexity of the <br /> develo went. <br /> Other agenies which comment on preliminary subdivision <br /> 9 � P Y <br /> plats but whi h are not Listed in the Subdivision Regulations <br /> include either the Town of Hillsborough or Carrboro (under <br /> courtesy review procedures) and the Orange County Recreation and <br /> Parks Advisory Council (also under courtesy review] . A response <br /> is sought from Hillsborough since the County administers its <br /> regulations within the Hillsborough extra—territorial area. A <br /> response is likewise sought when the development is adjacent to <br />