Orange County NC Website
00021-9 <br /> Priority Pollutants Lists. <br /> I] Design and constructions specifications for storage <br /> racilities for hazardous materials, including spill <br /> containment measures and contingency plans for <br /> 6n—site containment and clean—up of spills. <br /> J) Sedimentation and erosion control plan . <br /> 8.8.26.2 Standards of Evaluation <br /> The following specific standards shall be used in <br /> deciding an application for this modification and use: <br /> Al The site plan .submitted meets all requirements <br /> specified in subsections 9.8 a) and 8.8.26 .1 a) . <br /> B) ALL applicable requirements of Article 4, 5, 6, <br /> 8, 9, 10 and 12 have been satified with the <br /> exception of the impervious surface ratio for which <br /> modification is requested. <br /> C) F ' <br /> ire police and rescue services, and water supply <br /> I <br /> and wastewater treatment methods are adequate to <br /> serve the proposed uses and facilities. <br /> 6 .23.4 Impervious Surface Regulated in Protected Watershed <br /> (Revise second paragraph to read as follows) <br /> In order to promote infiltration of stormwater runoff <br /> into the soil and to .minimize direct end immediate <br /> run6ff into streams and water supply impoundments, <br /> imp6rvious surface ratios shall be required as <br /> provided in the Table of Impervious Surface Ratios — <br /> Sectlion 6.23.4. Modifications of the Impervious <br /> Surface Ratios may be requested, however, as a Class A <br /> Special Use in accordance with the provisions of <br /> Section 8 of this Ordinance. In no case shall a <br /> modification be granted for property located in a <br /> designated Water Quality Critical Area, and no <br /> modification granted under the provisions of Section 8 <br /> shall exceed the ratios established in Section 6 .23.4 <br /> for the Protected Watershed (PW—II) District by more <br /> than five percent (5%) . <br /> Impervious surface calculations for an individual <br /> development shall be cumulative for original <br /> construction and any subsequent additions, and <br /> calculations of impervious surface coverage for <br /> inde6ridual lots shell include that portion of a <br /> rigi*of—way between the centerline of the street and <br /> the abutting property Line of the lot. <br />