Browse
Search
Agenda - 11-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:47:53 AM
Creation date
9/14/2016 9:32:27 AM
Metadata
Fields
Template:
BOCC
Date
11/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
000217 <br /> MODIFICATION OF IMPERVIOUS SURFACE RATIOS <br /> ISSUE: An inquiry has been made regarding the expansion of an <br /> exiisting industrial establishment in Orange County . <br /> The owner has experienced difficulty in complying with <br /> the impervious surface ratio (12%) required for a site <br /> witiin a protected watershed and served by well and <br /> septic tank. The problem may also exist for other <br /> residences, businesses or industries. <br /> Draft proposals of the Research Triangle Council of <br /> Governments included provisions for flexibility <br /> through special use permit procedures. The proposed <br /> ordnance amendment is based on the TJCOG proposals . <br /> EXISTING ORDIN NCE PROVISIONS <br /> There are no existing provisions for modification of <br /> the impervious surface ratios. <br /> PROPOSED ORDINANCE REVISIONS <br /> 8 .8 .28 Modification of Impervious Surface Limitations <br /> 8.8.26 .1 Additional Information <br /> In addition to the information requested in Subsection <br /> 8.2Iand 8.8, the following shall be supplied as part <br /> of the application : <br /> A) A site plan which shell include the following: <br /> 1 ) The dimensions and acreage of the lot to be <br /> built upon or otherwise used; <br /> 2] The site layout of the entire project, <br /> including existing and proposed buildings and <br /> their uses, and its relationship to surrounding <br /> properties; <br /> 3) The Layout of ell off—street parking and _ <br /> Loading areas, including the location of entry <br /> and exit points, the internal .vehicular <br /> circulation pattern, the location and dimension <br /> of required parking and loading spaces, and the <br /> materials of which such facilities are <br /> constructed. <br /> ) The location , dimension and method of <br /> construction of all existing and proposed <br /> streets and highways, <br /> 5,) The location , size and name of all existing <br />
The URL can be used to link to this page
Your browser does not support the video tag.