Browse
Search
Agenda - 11-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:47:53 AM
Creation date
9/14/2016 9:32:27 AM
Metadata
Fields
Template:
BOCC
Date
11/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
000139 <br /> &tun id Willsher $ <br /> Mose Twos <br /> HILLSBOROUGH. NORTH CAROLINA 21278 as+m+Malawi <br /> &ft Watr Winds <br /> W.Pied k yth �.1 i r, C.E.Rosemead <br /> Ala A.1 ``I of ,1 . <br /> Wsgoner <br /> limo H.jabs= <br /> Dr.IOm Demos ■ Mee/Pace <br /> Reams J. a E C E I V E Arnold W.Hamlet <br /> 111'. D <br /> TO: Orange County Planning Dept. - <br /> FROM: Hillsborough Planning Board <br /> RE: Courtesy Review of Rezoning Request for Wildwood Section IV <br /> DATE: November 15, 1985 <br /> On Nofvember 14, 1985 the planning board conducted a courtesy review of <br /> the rezoning request for Wildwood Section IV and recommended that the 28.80 <br /> acres be rezoned to R-2, or at the most, R-3. While the board recognizes that <br /> existing Wlildwood Sections t .tI;I are zoned P-4 and R-5, the topography of <br /> the site and the impact of traffic on existing neighborhoods in Wildwood <br /> raises concerns as to the overall impact of the proposed development. <br /> The board is particularly concerned about road conditions (i.e. construction <br /> as well as capacity to handle more traffic), erosion control and increased <br /> traffic at the project site. - <br />
The URL can be used to link to this page
Your browser does not support the video tag.