Browse
Search
Agenda - 11-25-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-25-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:47:53 AM
Creation date
9/14/2016 9:32:27 AM
Metadata
Fields
Template:
BOCC
Date
11/25/1985
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
000127 <br /> 5. Proposed Developments High/Medium Scenarios <br /> a. Siotswood <br /> o 41-0 single- family units184,500/123,000 GPO <br /> o 216 multifamily units (2 badrms <br /> per unit] . ... , ... . 64,800 GPO <br /> o ESTIMATED USE .. ... 249,300/187,800 GPO <br /> b . WiiLdwood Section IY <br /> of 28.80 acres, R-4 zoning: <br /> o Assume 24.48 acres developed (a) <br /> o TOTAL: 98 units 44,100/29,400 GPO <br /> TOTAL ESTIMATED USE 293,400/217,200 GPO <br /> WATER TREATMENT PLANT; <br /> o REMAINING CAPACITY 787,600/931 ,600 GPO <br /> a % OF PLANT CAPACITY USED 74% / 89% <br /> WASTEWATER TREATMENT PLANT: (h) <br /> o REMAINING CAPACITY Of) (g) 387,600/531 ,600 GPO <br /> a % OF PLANT CAPACITY USED 81% / 73% <br /> (al Assume 150 gallons- per day (GPO] per bedroom. <br /> [b] High scenario— 3 bedrooms per dwelling unit; medium <br /> scanari1a— 2 bedrooms per dwelling unit. Both scenarios. <br /> were used, unless a site plan specified the number of <br /> be.droom�s per unit. Assumed 2 bedrooms per mobile home. <br /> (c) SubtracFted out 15% for roads. - <br /> (d] "Sewer System Fesibility Study for Centre! Orange Study <br /> Area". 1E C Maguire, Ina. May, 1985. <br /> (a) Subtracted out 5 mobile homes for which building permits <br /> have been issued. <br /> (f]' Assumed1150 GPO of wastewater (per bedroom] is treated. <br /> (g] These figures do not account for groundwater <br /> infiltration into the sewer lines. <br /> (h] These figures do not reflect the amount of wastewater <br /> treatment capacity earmarked for the EfLand area . The <br /> initieLlcapacity set aside for the Efland area will be <br /> 55,000 GPO, and wilt eventually be expanded to 325,000 <br /> GPO. <br /> II <br />
The URL can be used to link to this page
Your browser does not support the video tag.