Browse
Search
Agenda - 11-19-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-19-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:39:09 AM
Creation date
9/12/2016 4:33:48 PM
Metadata
Fields
Template:
BOCC
Date
11/19/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
031 <br /> ORANGE COUNTY <br /> BOARD OF CCEIMISSIOWS Action Agenda <br /> ACTION AGENDA ITEM ABSTRACT Item No. Erl <br /> Meeting Date: NOVEMBER 19, 1985 <br /> SWEET: ROOF REPLACEMENT BlDS---10/WOUSEOUSE <br /> DEPARTMENT: .'1- :r- IN G PUBLIC HEARING: _Yes A-1lb <br /> ATTACHMENT(S): INFORMATION CONTACT: PAM JONES <br /> X497 <br /> BID TABULATION TELEPHONE NUMBER: <br /> PROJECT SPECIFICATIONS AND BID Hillsborough - 732-8181 <br /> FROM M AND WROOFING AND INSULr Chapel Hill - 968-4501 <br /> ATION, INC. Mebane - 227-2031 <br /> ROOF GUARANTEE AN) CONTRACT Durham - 688-7331 <br /> PURPOSE: To consider approval of contract for repair of two sections of <br /> roof at New Courthouse, 106 Margaret Lane. <br /> NEED: The two areas in question are roofs targeted as priority repair <br /> arias in the roof survey done last year. There is a leaking <br /> problem in the Court vault area which prompted the repairs. <br /> The foam system will be identical to that on the roof at <br /> Northern Recreation Center, which has been in place for about <br /> years and has experienced no major problems. An addi- <br /> tional benefit will be the increased insulation factor which <br /> shobld have an energy saving effect. <br /> IMPACT: Price comparison between built up roof replacement and the <br /> polyethelyne foam showed a wide variance. The project using the <br /> foam system will cost the County $2,850 (2.38/sq. ft.), while <br /> the lowest estimate for a built up roof was approximately $6,100 <br /> (5.08/sq. ft.) . <br /> Funds are available within the County Capital Improvement. Fund. <br /> RECOMMENDATMOWS : <br /> To approve the contract with M and W Roofing and Insulation, <br /> Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.