Browse
Search
Agenda - 11-19-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-19-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:39:09 AM
Creation date
9/12/2016 4:33:48 PM
Metadata
Fields
Template:
BOCC
Date
11/19/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, . <br /> ■ <br /> + ' <br /> 3 <br /> area for which run-off may be captured) , based upon present <br /> _ operating practices, is at times as low as 27.77 square <br /> L miles. 'These practices (i.e. having to keep the augmented <br /> - . <br /> water supply at dam level in order to pass water to Ben <br /> Johnson) prevent the reservoir from capturing the full runoff . <br /> 1 <br /> = <br /> from its drainage area. The same condition has existed to a <br /> c - lesser extent at Lake Ben Johnson where the shallow depth of <br /> the intake and reluctance to use the release structure <br /> • <br /> prevent full use of storage. <br /> , . <br /> Thirdly, while the Upper Eno River Basin is relatively . <br /> small the distribution area is considerable. Orange Alamance <br /> serves customers in two counties and two major basins (Neuse <br /> ' and Cape Fear) . By the same token Hillsborough's water sales <br /> to CATA$A have resulted in water distribution and ultimate <br /> loss tolanother basin. <br /> - 1 <br /> t - III. % . DIN Tp BE ANSWERED AND DEFINITIONS <br /> [ . <br /> ' 1 <br /> What is the capability of the Upper Eno River with its <br /> reservoirs to accommodate water withdrawal and instream flow <br /> protection demands? Stated in other terms, to what extent is <br /> the river at capacity given the withdrawals being made? If . <br /> e capability is low or under capacity use conditions what <br /> should be done about it? By "water withdrawal" it is meant <br /> to refer to the rates of water removed from the river for <br /> purpose S of treatment and sale (wholesale and retail) . <br /> "instrebm flow requirement" is the term given to a variety of <br /> •governmental measures designed to maintain certain minimum <br /> flows in rivers and streams. These measures take the form of - - <br /> requirements to ensure water quality, sustain fish life and <br /> preserve habitat fer fish or game. <br /> The concept of maintaining a minimum flow release from <br /> water sppply impoundments dates from about 1960. Laws to <br /> implement the concept were passed in 1967. Recent projects <br /> in the 'triangle area, including the Little River Dam and the <br /> Eno River withdrawals for the City of Durham and the <br /> tempordry and permanent impoundments on Cane Creek for GWASA <br /> have each been assessed with a prescribed minimum flow <br /> release incorporated into one or more of the various permits <br /> for construction. The proposal by the State NRCD Division of <br /> Water Resources to establish a minimum instream flow require- <br /> ments en the Eno River below Lake Ben Johnson is preceeded by • <br /> such action involving the City Lake at Rocky Mount. As <br /> related to Orange County the State is a downstream reparian <br /> owner With the presence of the Eno River State Park in Orange <br /> County <br /> 1 <br /> rv. METH Iwo <br /> , . <br /> In seeking to answer the first study question the <br /> Division of Water Resources used what it called the Recursive <br /> Simulation Computer Model to the analyze the River as it is <br /> currently operated. At the County's request it took into <br /> account different withdrawal rates as might be applied <br /> assuming water use restrictions during danger periods and <br /> various factorings for instream flow protection. measurement <br /> of river flows was based on data recorded over a 40 year <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.