Orange County NC Website
0 60 <br /> CHANGE ORDER <br /> Change Order No. 1 <br /> CONTRACT NAME: Toilet Facility Renovations Change Order Initiation Date: 10-25-85 <br /> :-: CONTRACTOR: D,W.Ward Construction Co./Inc. Contract Date: 8-5-85 <br /> PO Box 15157 <br /> Durham, NC 27704 <br /> The following changes are requested: <br /> 1. Extend contract time by ninety (90) days due to contractors inability <br /> to get porcelain restroom partitions from manufacturer. <br /> The original (contract sum)(Guaranteed Maximum Cost) was $ 10,958.00 <br /> .00 <br /> Net change by previously authorized change orders <br /> (Contract Sum. )(Guarangeed Maximum Cost) prior to this . 10/958.00 <br /> change order was <br /> (Contract Sum)(Guaranteed Maximum Cost) will be UNCHANGED <br /> by this change order <br /> The new (Contract Sum)(Guaranteed Maximum Cost) including <br /> this change order will be $ 10,958.00 <br /> The contract time will be INCREASED by ( 90 ) DAYS <br /> The date of Substantial Completion as of the date of this <br /> change order therefore is Feb. 12, 1985 <br /> • <br /> AUTHORIZED: <br /> OWNER • It , "skJei,"/Z, 77/ <br /> , _ „ /, ,„„se, <br />