Browse
Search
Agenda - 11-04-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-04-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:33:48 AM
Creation date
9/12/2016 3:55:29 PM
Metadata
Fields
Template:
BOCC
Date
11/4/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2u A/N 601 OHO 5 <br /> -e Council Member Pasquini asked that the amount of cut and fill <br /> along Franklin Street be established for Council review. He also <br /> said he would like to see a fifty foot buffer along Franklin <br /> Street ; a plan showing the surrounding areas and their designated <br /> uses; a plan for negating the connection with Lone Pine Road, and <br /> show the access road (driveway) to lots six and seven. <br /> Council Member Thorpe expressed concern that the Planning Board <br /> which had received their agenda packet on Friday had not notified <br /> the Council or staff prior this meeting of their disagreement <br /> with the recommendation attributed to them and stated in the <br /> memorandum. <br /> Council Member Preston was concerned about the traffic along <br /> Franklin Street and Lone Pine Road and she asked what it would <br /> entail to improve Lone Pine Road and whether or not such <br /> improvements would have to be paid for by the residents of that <br /> road. She also said the Council in January of 1984 adopted a <br /> resolution renaming Louise Street to Deming Street and asked that <br /> the name Deepwood Road be deleted and have it called Deming <br /> Street as well. <br /> COUNCIL MEMBER PRESTON MOVED, SECONDED BY COUNCIL MEMBER SMITH TO <br /> DELAY COUNCIL ACTION UNTIL THE NEXT REGULAR MEETING AND FOR THE <br /> MANAGER TO BRING BACK A REPORT CLARIFYING THE PLANNING BOARD'S <br /> REVIEW. THE MOTION PASSED UNANIMOUSLY, (7-0). <br /> Mayor Nassif asked that the citizens and applicants be kept <br /> informed of what was happening with this project . <br /> Lacy Burch Subdivision <br /> Roger Walden, Planning Director, gave a brief presentation on <br /> this application. He said this project was in the joint planning <br /> area. He said the site was 3 lots on 3.17 acres north of Link <br /> Road. He said the staff recommended requiring the extension of <br /> waterlines to the public., and paving the street with curb and <br /> gutter. <br /> Mr. Greg Shepard, representing the applicant, said that since the <br /> site was under Orange County jurisdiction the applicant should <br /> have to only abide by Orange County requirements. He said Orange <br /> County allows for paving without curb and gutter and for wells <br /> and septic tanks. Mr. Shepard said that meeting Chapel Hill <br /> requirements would cost the applicant $85,500 in additional costs <br /> to subdivide the site into 2 additional lots. <br /> Council Member Smith asked if the project should meet County <br /> standards and not Town standards should the Town review it? <br /> Manager Taylor replied that pursuant to the Joint Planning <br /> Agreement between . the Town and Orange County the proposed <br /> project was in the 10-year transition area and would become <br /> urban. Therefore the project should meet urban standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.