Browse
Search
Agenda - 11-04-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 11-04-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:33:48 AM
Creation date
9/12/2016 3:55:29 PM
Metadata
Fields
Template:
BOCC
Date
11/4/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
015 <br /> be Left disturbed for Long periods if there was a delay <br /> in filling the reservoir. <br /> SECTION 17 <br /> Section 17 Permits <br /> a . <br /> No permit is required for the following activities: <br /> 1 . For the purpose of fighting fires. <br /> 2. For the stock piling of raw or processed sand, stone, <br /> or gravel in material processing plants and storage <br /> yards, provided that sediment control measures have <br /> been utilized to protect against off—site damage. . <br /> 3. For disturbances that do not exceed 20,000 square feat <br /> in surface area. In determining the area, contiguous <br /> Lands under one or diverse ownership being developed as <br /> a unit will be aggregated. <br /> NOTE: This paragraph will be added to Section 17a to specify <br /> what activities do not require permits. <br /> SECTION 18 <br /> Section 18 Erosion and Sedimentation Control Plans <br /> c. Failure to approve or disapprove a complete erosion and <br /> sedimentation control plan within 30 days of receipt of <br /> the complete plan shalt be deemed approval. Denial of a <br /> plan must specifically state in writing the reasons for <br /> denial. The county must approve or deny a revised plan <br /> within 15 days of receipt, or it is deemed to be approved. <br /> If, following commencement of a land—disturbing activity <br /> pursuant to an approved planithe County determines that <br /> the plan is inadequate to meet the requirements of this <br /> ordinance, the County may require such revisions as are <br /> necessary to comply with this ordinance. <br /> In order to be considered complete, a plan submitted for <br /> approval must contain the proposed erosion control plan , <br /> the completed application, the statement of financial <br /> responsibility and ownership , and the plan review fee. <br /> • The 30 day review period begins when all of the components <br /> of the complete plan are received. <br /> NOTE: Section 18c will be expanded to include the two para- <br /> graphs above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.