Browse
Search
Agenda - 10-15-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 10-15-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:21:20 AM
Creation date
9/12/2016 3:32:45 PM
Metadata
Fields
Template:
BOCC
Date
10/15/1985
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> - -Orafige County Land Records System Page 12 <br /> E. ADDENDUM 1 will be the definition of the topographic <br /> map produced. <br /> F. The CONTRACTOR will plot the parcel identifier numbers <br /> (PIN's) as they currently exist upon COUNTY'S Central <br /> Land Records System, with the coordinates to be <br /> provided by COUNTY. <br /> G. Parcel splits and transfers will be current within 30 <br /> days of delivery of cadastral maps. <br /> 4 PAYMENTS TO CONTRACTOR. <br /> A. Cash payments of the agreed upon total cost will <br /> be made by the C UNTY to the CONTRACTOR based an the <br /> satisfactory comp etion of the various Phases of the <br /> project work accor ing to the described Phase breakāout of <br /> the total costs in Section 1 of this Agreement. <br /> B. CONTRACTOR may secure payment for a percentage or <br /> the full amount o monies allocated to a Phase of work <br /> (see "A" above) byisubmitting to the COUNTY the following: <br /> 1. All deliverable items representing that percentage <br /> or the full amount of work for which CONTRACTOR <br /> is claiming payment. <br /> I <br /> 2. A progressireport describing the work completed, <br /> as well as how the percentage, if not the entire <br /> project, was calculated. <br /> 3. A dated invoice showing the amount of the claimed <br /> payment with a brief description of the work done <br /> for each separate amount being claimed. <br /> i <br /> 1 <br /> 4. If claiming for performance bond costs, certified <br /> proof thatIthe bond(s) has/have been issued by <br /> an approved banding firm_ <br /> C. The COUNTY will make prompt payments to the <br /> from ROSCOE E REEV 15: 03: 34 22 NOV 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.