Orange County NC Website
• ' Orange County Land Records System Page 4 <br /> 1"= 100' 202( <br /> 1"= 200' 54 <br /> 10= 400' 31 . ... <br /> "--, <br /> C. Production of Topographic Flaps of <br /> 1"= 100' area of Chapel Hill Town- <br /> ship, "Arab A", at 2' contour intervals, <br /> being 203 'sheets for $448. 99 per <br /> tope map ($91, 145). <br /> And will be don by CONTRACTOR for a total cost of <br /> $179,892, with the cost of CONTRACTOR 'S performance bond <br /> for this Phase and Phase 1 included. All materials and <br /> associated . products, as required in COUNTY'S "Request for <br /> Proposal", offered in CONTRACTOR "Proposal", or required <br /> by State Specifications, prepared under Phase 2 of this <br /> contract will, be completed and delivered to the COUNTY no <br /> later than the following schedule, and as indicated on the <br /> Contract Map: <br /> Priority <br /> Date Number of Ortho 's Area Number of Topa Maps <br /> ---- <br /> 4/1/86 . 96 1 67 <br /> 1 <br /> 6/1/86 97 2 68 <br /> 9/1/86 97 3 68 <br /> . . <br /> 1. 3 Phase Three (19 6-1987) : <br /> This Phase of the contract work will include: <br /> A. Aerial photography at 1"= 2000' and <br /> 1"= 1000' and 1"= 500' of all other COUNTY <br /> townships Od remainder of Chapel Hill <br /> township, 'including pre—paneling ($12, 878); <br /> B. Ground Control Horizontal ($7, 727) of <br /> all other 'COUNTY townships and remainder of <br /> from ROSCOE E REEVE 15: 03: 31 22 NOV 1985 <br /> I <br />