Browse
Search
Agenda - 09-30-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 09-30-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:18:00 AM
Creation date
9/12/2016 3:02:39 PM
Metadata
Fields
Template:
BOCC
Date
9/30/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.8i1 • <br /> • <br /> DRAFT PLANNING BOARD MINUTES 9-18-86 21 <br /> Pilkey inquired if a letter had been received from <br /> the railroad company . Smith advised the Board to <br /> look at the evidence of this public hearing . <br /> VOTE: 8 in favor . Miller abstained . - <br /> AGENDA ITEM #9d : Z-2-85 REZONING REQUEST OR KHYE WENG NG AND WIFE <br /> GUAT CHANG NG <br /> Pearson abstained from voting due to professional <br /> conflict of interest . <br /> Presentation by Susan Smith . <br /> The purpose of this agenda item is to consider for <br /> recommendation a proposed rezoning request <br /> submitted to public hearing on February 25, 1985 <br /> and continued to August 28 , 1985 . <br /> The Planning Staff recommends approval of the <br /> request. <br /> Smith reminded the Board this was a rezoning <br /> request from R-1 to R-3 . She noted the <br /> information to be considered was only that <br /> presented at the public hearing and that which is <br /> in the agenda packet . <br /> MOTION: Shanklin moved positive findings on all specific <br /> standards. Seconded by Yuhasz. <br /> Pilkey inquired what the Town of Hilsborough <br /> comment was on the zoning request . Smith <br /> responded there was a unanimous vote from the Town <br /> Planning Board that the Wang request was <br /> appropriate for the area . <br /> Kramer inquired about the Letter regarding water <br /> and sewer service for the rezoning request area <br /> Pilkey responded a Loop system had been proposed . <br /> Jacobs reminded Board members that the figures <br /> twelve to eighteen months was the time period <br /> given before water and sewer service would be <br /> available . <br /> Smith clarified that the Letter from the Town <br /> specified a willingness to serve the development <br /> and noted that the issue for the County was not <br /> the engineering of the system . <br /> MOTION: Adjournment time was reached . Yuhasz moved to <br /> extend the meeting time fifteen minutes to <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.