Browse
Search
Agenda - 09-30-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 09-30-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:18:00 AM
Creation date
9/12/2016 3:02:39 PM
Metadata
Fields
Template:
BOCC
Date
9/30/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 244 <br /> • <br /> - • Durham Construction Company, Inc. <br /> 112 Britania Avenue <br /> Post Office Box 15028 ' <br /> Durham, North Carolina 27704 . • <br /> August 12, 1985 <br /> Roman Kolodij Architects <br /> • 121 South Estes Drive • <br /> Suite #103 <br /> Chapel Hill , North Carolina 27514 <br /> • Re: Orange County Courthouse <br /> • <br /> Hillsborough, North Carolina <br /> Dear Mr. Kolodij: <br /> • <br /> There are some questions on the above project that need to be . <br /> answered in order for us to proceed. <br /> A. Asbestos Time Extension <br /> Please issue us a change order for the time lost in <br /> the county having the asbestos insulation removed - <br /> from the building. Our records show that seventy- <br /> eight (78) days -April 22,1985-July 8, 1985-were <br /> lost. • <br /> B.. Color Selections <br /> Please make the color selections for the painting, <br /> ceramic tile, and resilient tile as per our request - <br /> of July 2, 1985. <br /> C. Main Floor Condition <br /> Please give us some instructions on what approach <br /> you would like for us to use in leveling the <br /> • <br /> existing floors for tile. The existing conditions <br /> • seem totally unacceptable for the finish floor <br /> materials. <br /> D. Ceiling in Room 109 <br /> • A portion of the existing ceiling in Room 109 had <br /> to be removed when we discovered that the existing <br /> ceiling joists were not anchored into the existing <br /> brick wall . Please advise us on what type of ceil- <br /> ing you would like for us to install in this area. <br /> . E. Finish Hardware Allowance <br /> . Please get with S. H. Basnight & Sons and make the <br /> final hardware selections so that the hardware and <br /> the hollow metal can be ordered: We need the hollow <br /> metal frames immediately. Bill Basnight informed <br /> us that it will take five to six weeks to fabricate <br /> the frames. This delay will hurt the job's pro- <br /> gress. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.