Browse
Search
Agenda - 09-30-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 09-30-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:18:00 AM
Creation date
9/12/2016 3:02:39 PM
Metadata
Fields
Template:
BOCC
Date
9/30/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• UMIANUt 0 A 4 Distribution.to: - <br /> ORDER A CHi ECr ID • <br /> AlA DOCUMENT 0701 CONTRACTOR El • <br /> FIELD ❑ s <br /> OTHER NI FILE <br /> PROJECT:. RENOVATIONS: CHANGE ORDER NUMBER: HAC.1 <br /> (name,address) ORANGE COUNTY HISTORIC <br /> COURTHOUSE INITIATION DATE: • AUG 15. 1985 • . <br /> TO(Contractor): HIL1.SSOROUCEI RC • <br /> Beas7oar ENGINEERS INC ARCHITECT'S PROJECT NO OC.81 <br /> • • P.O E1o0t; 2995 CONTRACT FOR - HEATING/ <br /> DURHAM NC 27705 0995 - AIR CONDITIONING <br /> CONTRACT P.O. ID ND. 7756 CONTRACT DATE: MARCH 20, 1985 <br /> You are directed to make the following changes in this Contract: . • • <br /> EXTEND THE CONTRACT TINE BY SIXTY-SIX (66) CONSECUTIVE CALENDAR DAYS <br /> . DUE; TO ASBESTOS RI VA1. (5 t DAYS) AND COMPLETE WALL REMOVAL (C.0.. G.01 <br /> 15 DAYS). • <br /> Not valid until signed by both the Chvner and Architect. <br /> Signature of the Contractor indicate%his agreement herewith,including any adjustment in the Contract Sum or Contract Time. • <br /> _ <br /> The original,(Contract Sum) ( )was $ 80 629.00 ,• <br /> Net change by previously authorized Change Orders $ oo . <br /> The(Contract Sum)( Cost)prior to this Change Order was $ 80 629.00 . <br /> The(Contract Sum) (Guara.ntes444aximiern Cost)will be (increased) (decreased) (unchanged) <br /> by this Change Order $ o o <br /> The new(Contract Sum)( )including this Change Order will be $ so 629.0 o <br /> The Contract Time will be (increased) (decreased) (inchlt ed)by - ( 66 ) Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is .. JAN. 10 1986 . <br /> Authorized: <br /> ROMAN tcDLOD 1 J •JAMES WEBB COUNTY OF ORANGE <br /> ARCHITECT ARCH I TEC'r5 CONTRACTOR ' OWNER NORTH CAROLINA <br /> Address dress <br /> 201 E ROSEMARY Sr S'r Address 106 E MARGARET LANE <br /> •.......,0:- .. _ • • HILLSBOROUGH NC <br /> - i' , , :% �i+_/y BY <br /> BY _ – �Y, <br /> DATE "}-, a DATE DATE <br /> AIA DOCUMENT 0701 • CHANGE ORDER • APRIL 1978 EDITION • AIA' • D 1978 <br /> . THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK.AVE..N.W..WASHINGTON,D.C.2 Dos 6701—1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.