1 <br /> CHANGE• Distribution to: 24A <br /> ORDER OWNER <br /> RCHITECT Si <br /> AMA DOCUMENT C701 CONTRACTOR ® . <br /> FIELD 0 <br /> - OTHER at FILE <br /> PROJECT:• RENOVATIONS: CHANGE ORDER NUMBER: G.02 <br /> (name,address) ORANGE COUNTY HISTORIC <br /> COURTHOUSE INITIATION DATE: . AUG 15, 1985 <br /> TO'(COntractor): HILLSBOROLIGti NC <br /> DURHAM CONSTRUCTION CO INC ARCHITECT'S PROJECT NO: oc.as <br /> 112 BRITTANIA AVE CONTRACT FOR:. . GENERAL <br /> P.O. BOX 15028 . CONSTRUCTION <br /> • DURHAM NC 27704 0028 <br /> • CONTRACT P.O.' ID NO. 7741 CONTRACT DATE: MARCH-20, 1985 <br /> You are directed to make the following changes in this Contract: CONTRACTOR'S ITEMIZED BREAKDOWN ATTAcHE;D <br /> 1. INSTALL. TWO (2) ,STEEL WALL STABILIZING RODS,LOCAT I ONE <br /> AS DIRECTED BY ARCHITECT: t $ 533.72 <br /> 2. INSTALL NEW CONCRETE FLOOR IN ROOM 109 TO REPLACE . <br /> • DETERIORATED EXISTING WOOD AND BRICK SUBFL.00R: ' . 6 654.00 <br /> 3. REPLACE DAMAGED PORTION OF EXISTING 12 IN. BRICK . <br /> WALL AT Ieit• 105, WITH 12 IN. CONC. BLOCK AND INSTALL <br /> NEW PLASTER FINISH: . 6. 997.50 <br /> 4.. INCREASE DEPTH OF A/C CONDENSER PIT BY 1'.0" TO <br /> • <br /> A DEPTH OF 8 FT TO ACCOMODATE REVISED A/C EQUIPMT. 6 489.00 . <br /> 5. REPLACE 10 FT PORTION OF DETERIORATED CORNICE AT • <br /> ' EXTERIOR EAST WALL WITH NEW MATCHING CONSTRUCTION: . 6. 622.70 <br /> SUB-TOTAL: 3296.42 <br /> OVERHEAD 8: PROFIT 734.26 <br /> • <br /> • C.O. AMOUNT: . . S 4030.67 <br /> 6. EXTEND CONTRACT TIME BY 51 CONSECUTIVE CALENDAR DAYS DUE TO <br /> REQUIRED ASBESTOS REMOVAL AND CERTIFICATION OF HAZARD ABATEMENT. • <br /> Not valid until signed by both the Owner and Architect <br /> Signature of the Contractor indicates his agreement herewith,including any adjustment in the Contract Sum or Contract Time. <br /> The original (Contract Sum) (GuaranteedIviaximumCost) was $ 247 700.00 <br /> Net change by previously authorized Change Orders 0.01 $ 6 231.50 <br /> The(Contract Sum) (Guaranteed-Maximum Cost)prior to this Change Order was $ 253 931.50 • <br /> The (Contract Sum) (Guerantetd•Moximum{post) will be (increased) (decreased) (unchanged) - 4 030.67 <br /> by this Change Order . $ . <br /> The new(Contract Sum)(Guitranleed•Mexitllurn Cost)including this Change Order will be $ 257 962.17 . <br /> The Contract Time will be (increased) (decreased) (unchanged)by ( 51 ) Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is JAN. TO 1986 <br /> • <br /> Authorized: <br /> ROMAN tOOL OD t r 'JAMES WEi - • COUNTY OF ORANGE <br /> ARCHITECT ARCHITECTS CONTRACTOR OWNER NORTH CAROLINA <br /> Address Address <br /> Address 201 E ROSEMARY ST 1 0 E MARGARET LANE <br /> .4,21.- . . _ c. 4 HILLSBOROUGH NC <br /> . , ! : i 4'" <br /> - BY .-..�..��.� �/..._ BY BY <br /> DATE "•`-, .' w Ct55 DATE DATE <br /> AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1971 EDITION • MAR • 0 1978 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.,N.W.,WASHINGTON,D.C.20094 G701--1978 <br />