. - •CHANGE Distribution to: • <br /> ORDER ARCHITECT Si <br /> AM DOCUMENT G707 CONTRACTOR ta - - <br /> FIELD 0 • <br /> OTHER IN FILE <br /> PROJECT: RENOVATIONS: • - CHANGE ORDER NUMBER: c.a2 <br /> (name,address) O c HI�IC <br /> INITIATION DATE: AUG 15, 1985 <br /> TO (Contractor): HILLSBCROUOM NC <br /> • DURHAM CONls'tiiLICTION CO ma ARCHITECT'S PROJECT NO: OC.81 . <br /> 112 BRITTANIA AVE • CONTRACT 1OR: • <br /> P.O. MD' 1X028 CONS RU T'Ot�N <br /> DURHAM NC 27704 0028 • <br /> • comma= P.O. ID NO. 7747 CONTRACT DATE: MARCH 20. 1985 <br /> i <br /> • You are directed to make the following changes in this Contract: CONTRACTOR'S ITEMIZED BREAKDOWN ATTACHED <br /> I. INSTALL TWO (2) STEEL. WALL STABILIZING RODS,LOCATIONS <br /> AS DIRECTED BY ARCHITECT: S 5 32.72 <br /> 2. INSTALL NEW CONCRETE FLOOR IN ROOM 109 TO REFUGE • <br /> • <br /> • DETER'ORATED EXISTING WOOD AN® BRICK SUBFLOOR. S. 654.00 <br /> 3. REPLACE DAMAGED PORTION OF EXISTING 12 IN BRICK <br /> • WALL AT R M. 105, WITH 12 IN CONC. BLOCK AND INSTALL - <br /> REV PLASTER FINISH: • S 997.50 <br /> 4. INCREASE DEPTH OF A/C CONDENSER PIT BY 1•.0" TO <br /> A DEP'T'H OF 8 FT TO ACCOMODATE REVISED A/C EQUIPMT. $ 486.00 <br /> 5. REPLACE 10 FT PONT I ON OF DETERIORATED CORNICE AT • <br /> EXTERIOR EAST WALL WITH NEW MATCHING CONSTRUCTION: , S 622.70 • <br /> SUB-TOTAL: 3296.42 • <br /> OVERHEAD & PROFIT 734.26 <br /> C.O. AMOUNT: • , $ 4930.67, <br /> 6. EXTEND CONTRACT TIME BY 551 CONSECUTIVE CALENDAR DAYS DUE TO <br /> REQU I RED ASBESTOS REMOVAL AND CERTIFICATION OF HAZARD ABATEMEI' • <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time <br /> The original (Contract Sum) (toaranteed-MaximurrrCost)was $ 247 700.00 <br /> Net change by previously authorized Change Orders 6.01 $ 6 231.50 • <br /> • <br /> The(Contract Sum) (Guaranteed"WtaxinlurrT Cost)prior to this Change Order was $ 253 93! .50 <br /> The (Contract Sum) (Guaranteed-Maximum•Gast) will be (increased) (decreased) (unchanged) 4 030.67 • <br /> by this Change Order $ . <br /> The new(Contract Sum) (Guaranteed-Memimum Cost)including this Change Order will be $ 257 962.177 <br /> The Contract Time will be (increased) (decreased) (unchanged)by ( 51 )Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is JAN, 1 o 1906 • <br /> . Authorized: <br /> ROMAN KOLODEJ JAMES WEBB DURHAM CONSTRUCT ION CO. COUNTY OF ORANGE <br /> •. . ARCHITECT ARCHITECTS CONTRACTOR - OWNER NORTH CAROLINA <br /> Address Address J <br /> Address 2 p t E ROSEMARY ST P.O. BOX 1 5 0 2 8 t o s E.NMARGAF2ET LANE <br /> -EL HILL, NC 27514 DURHAM NC 27704 0028 HILLSBOROUGH a NC <br /> V j <br /> • • DATE ".'''7:' w c=55. DATE 2.-42 51, DATE //--/A --, ,S <br /> AIA DOCUMENT.G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA6 • ©1978 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE..N.W.,WASHINGTON.D.C.20006 G701 -1978 <br /> • <br /> • <br />