234 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS Action Agenda <br /> ACTION AGENDA ITEM ABSTRACT Item No. J1 1 <br /> Meeting Date: SEPTEMBER 30, 1985 <br /> SUBJECT: OLD COURTHOUSE CHANGE ORDERS <br /> DEPARTMENT: COUNTY MANAGER PUBLIC HEARING: Yes _ZJIo <br /> ATTACHMENT(S): INFORMATION CONTACT: MANAGER'S <br /> OFFICE, X501 <br /> TELEPHONE NUMBER: <br /> YES Hillsborough - 732-8181 <br /> Chapel Hill - 968-4501 <br /> Mebane - 227-2031 <br /> Durham - 688-7331 <br /> PURPOSE: To consider three change orders (P.1, G.02, HAC.1 and E.01) to <br /> the scope and timing of the work. <br /> NEED: change Order P.1, requested by the contractor July 17, 1985 and <br /> recommended by the Architect September 18, 1985, would (1) add a <br /> drinking fountain, (2) reroute a 4" waste line in the basement, <br /> (3) replace deteriorated lines and upgrade water supply to the <br /> building, (4) install a different type water closet, and (5) <br /> extend the contract time by an additional 66 days due to <br /> asbestos and concrete wall removal. <br /> If approved the changes would add $3,313.89 to the original <br /> plumbing contract sum of $13,000. <br /> Change Order G.02, requested by the contractor July 17, 1985 and <br /> August 12, 1985 and recommended by the Architect September 18, <br /> 1985, would allow (1) installation of steel stabilizing rods to <br /> the outside wall, (2) installation of a new concrete floor in <br /> Room 109, (3) replacement of a portion of damaged wall, (4) <br /> increasing the depth of the A/C condenser pit, and (5) replace- <br /> ment of a 10 ft. portion of deteriorated cornice. <br /> If approved the changes would add $4,030.67 to the adjusted <br /> general contract sum of $253,931.50. <br /> Change Order HAC.1, and E.01 recommended by the architect <br /> September 18, 1985, likewise requests an extension of 66 conse- <br /> cutive calendar days to the electrical and heat/air condition <br /> contracts. It is due to the time required for asbestos and <br /> concrete wall removal in the vault area of the first floor. <br /> If approved the new date for completion would be moved from <br /> November 5, 1985 to January 10, 1986. <br />