Browse
Search
Agenda - 09-30-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 09-30-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:18:00 AM
Creation date
9/12/2016 3:02:39 PM
Metadata
Fields
Template:
BOCC
Date
9/30/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
._ <br /> 121 <br /> 10 <br /> Willard Cates,. resident of Byrdsville for 12 years, expressed concezzt with <br /> traffic problem, debris and concrete spillage on sides of the road and near <br /> stop sign. <br /> 2. Z-7-85 GEORGE HORTON REZONING <br /> The presentation was made by Director of Planning Marvin Collins. <br /> This agenda item is to consider a rezoning request for George Horton. <br /> C. D. Hogue is requesting a rezoning for George Horton on 86.51 acres out <br /> of 103 acres of lard located along Highway 70 Business southeast of <br /> ili'llsbarough. The remaining 16.49 acres will not be changed from present R-1 <br /> zoning designation. The property is referenced as Tax Map 40 Block A Lots 11 <br /> and 14 of Hillsborough Township. The property is located in an area designated <br /> as Ten Year Transition and. Commercial Industrial Activity Node in the Orange <br /> County Lath Use Plan. <br /> I ' The present zoning is R-1. The applicant is requesting 26.65 acres to be <br /> rezoned to 0-I and 59.86 acres to be rezoned I-1. <br /> Approval of the request would allow Office-institutional uses on the 16.65 <br /> acres and. Industrial-1 uses on the 59.86 acres. <br /> A 1984 traffic count on Business 70 indicated 1200 trips per day. Cb. N.C. <br /> 86 between Business 70 and Valley Forge Road (SR 1200) a 1984 traffic count <br /> indicated 4200 trips per day. <br /> If the 59.86 acres proposed to be zoned I-1 were developed approximately <br /> 3,137 trips per day could be generated. If the 26.65 acres proposed to be <br /> zoned 0-I were developed, an additional 3,866 trips would possibly be <br /> generated. Unless some other type of access is obtained, all of this traffic <br /> would be directed to U.S. 70 Business. <br /> According to the Department of Transportation (Dar) , U.S. 70 Business is <br /> presently classified at service level C or better. At the current speed limit <br /> of 45 MPH and given a 20' travelway, the capacity of U.S. 70 Business at <br /> service level C is estimated to be 5,770 trips per day. <br />
The URL can be used to link to this page
Your browser does not support the video tag.