Browse
Search
Agenda - 09-30-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 09-30-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 8:18:00 AM
Creation date
9/12/2016 3:02:39 PM
Metadata
Fields
Template:
BOCC
Date
9/30/1985
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
112 <br /> 03PID or =CRETE — • za moo,,,Iv_o_ksy igr_ USE PLAN <br /> 10-3-84 Chandler Concrete merged undeveloped 4.34 acre tract to 1.47 <br /> acre tract containing their concrete plant. <br /> 1-7-85 Grange County Health Department and N.C. Division of Environ- <br /> Rental, Management MO offiriAls visited Chandler's new tract <br /> in response to citizen complaints about wastewater runoff. <br /> 1-10-85 Mr. J. C. TUttle of Chandler Concrete was advised by a letter <br /> from DEM that they (Chandler Concrete) were illegally <br /> discharging wastewater and that a permit was required. DEM <br /> requested written plans by 2-1-85 for management of wastewater <br /> either by recycling on site or treating and dismharging. <br /> 1-17-85 Application forns were sent to Chandler by DEM for discharge and <br /> on site management of wastewater. <br /> 1-30-85 Chandler responded to DEM and indicated intent to comply with <br /> DEM requirements. <br /> 2-8-85 Major transportation corridor (DE) site plan was submitted to • <br /> ()range County Planning Department. <br /> 2-13-85 Chandler received a permit from the Orange County Sediitentation <br /> & Erosion Control Division to clear and grade new site. In con- <br /> junction with clearing and grading site, two retention ponds <br /> were constructed. Chandler planned to recycle water from lower <br /> pond back through concrete plant by use of pumps. This was an <br /> - • <br />
The URL can be used to link to this page
Your browser does not support the video tag.