Orange County NC Website
O91 <br /> DRAFT PLANNING BOARD MINUTES 9-16-85 13 • <br /> 10. A final boundary survey of the Planned <br /> Development and improvements shall be <br /> recorded by the developer . <br /> 11 . The final site plan and narrative of the <br /> project, incorporating all changes , <br /> deletions and additions through the final <br /> approval of the project, are to be <br /> incorporated herein and made a part of <br /> this Planned Development Special Use <br /> Permit . Copies of the final site plan <br /> and narrative are to remain on file with <br /> the Orange County Planning Department . <br /> Grading and building permits , upon <br /> application , will be issued after <br /> • approval and recordation of the Special <br /> Use Permit. <br /> 12. The development shall be built and <br /> operated according to the site plan and <br /> written narrative supplied by the <br /> developer and in compliance with the <br /> above conditions . <br /> Smith noted that this application met all require- <br /> ments . <br /> • <br /> MOTION: Pearson moved positive findings on aLL specific <br /> standards . Seconded by Pilkey . <br /> VOTE: In favor 7. <br /> Abstentions (Miller—new member , Yuhasz) . <br /> Best was out of the room during this vote . <br /> MOTION: Pilkey moved general findings have been satisfied . <br /> Seconded by Pearson . <br /> VOTE: In favor 7. <br /> Abstentions (Miller — new member , Yuhasz) . <br /> Best was out of the room during this vote . <br /> • <br /> II MOTION: Pearson moved approval of the special use permit <br /> with staff conditions. <br /> Seconded by Jacobs . <br /> VOTE: In favor 7. <br /> Abstentions (Miller — new member, Yuhasz) . <br /> Best was out of room during this vote . <br /> Agenda Item #9b : LUP-3-95 Chandler Concrete Company . <br />