Orange County NC Website
09C' <br /> DRAFT PLANNING BOAAQ MINUTES 9-18-85 13 <br /> 10. A final boundary survey of the Planned <br /> Development and improvements shall be <br /> recorded by the developer . <br /> 11 . The final site plan and narrative of the <br /> project, incorporating all changes , <br /> deletions, and additions through the final <br /> approval of the project , are to be <br /> incorporated herein and made a part of <br /> this Planned Development Special Use <br /> Permit. Copies of the final site plan <br /> and narrative are to remain on file with- <br /> the Orange County Planning Department. <br /> Grading and building permits , upon <br /> application , will be issued after <br /> approval and recordation of the Special <br /> Use Permit. <br /> 12•. The development shall be built and <br /> operated according to the site plan and <br /> written narrative supplied by the <br /> developer and in compliance with the <br /> above conditions . <br /> Smith noted that this application met all require— <br /> manta, <br /> MOTION: Pearson moved positive findings on all specific I <br /> standards . Seconded. by Pi lkey . <br /> VOTE: En favor- 7. <br /> Abstentions (Miller—new member , Yuhasz) . <br /> Best was out of the room during this vote . <br /> MOTION : Pi lkey moved general findings have been satisfied . <br /> Seconded by Pearson . <br /> VOTE: In favor 7. <br /> Abstentions (Miller — new member , Yuhasz) . <br /> Best was out of the room during this vote . <br /> MOTION; <br /> Pearson moved approval of the special use permit <br /> with staff conditions . <br /> Seconded by Jacobs . <br /> VOTE: In favor 7 . <br /> Abstentions (Miller — new member , Yuhasz] . <br /> Best was out of room during this vote . <br /> Agenda Item #Sb : LUP-3-8S_ Chandler Concrete Company . <br />