Orange County NC Website
011 <br /> approval of an erosion control plan before <br /> starting the land—disturbing activity. <br /> 5. Section 9 Permanent Downstream Protection <br /> of Stream Banks and Channels <br /> Amend Section 8 to correctly refer to the <br /> table of parmissable velocity contained in <br /> this section . <br /> O. Section 13 Responsibility for Installation <br /> and Maintenance <br /> Amend Section 13 to include responsibility <br /> for installation , as well as maintenance, <br /> and rearrange the section for clarity. <br /> 7. Section 15 Existing Uncovered Areas <br /> Amend Section 15 to require mailing notices <br /> by registered or certified mail and not re- <br /> quire ground cover on cleared reservoir <br /> sites unless Left undisturbed for an un- <br /> reasonable Length of time. <br /> 8. Section 17 Permits <br /> Amend Section 17 to specify what activities <br /> do not require permits. <br /> 9. Section 18 Erosion and Sedimentation Con- <br /> Amend troL <br /> 18 to set time limits on <br /> review of erosion control plans; define <br /> what constitutes a complete plan; require <br /> revisions to approved plans when a risk of <br /> erosion or sedimentation exists; to require <br /> a statement of financial responsibility and <br /> ownership with the plan; and to require <br /> that a copy of the approved plan be kept on <br /> the site. <br /> 10. Section 19 Appeals <br /> Amend Section 19 to allow the first appeal <br /> of a plan denial to the Planning Director <br /> and to refer final appeals to the Sedimen- <br /> tation Control Commission . <br /> 11 . Section 21 Inspections and Investigations <br /> Amend Section 21 to notify responsible <br /> persons of violations; specify measures <br />